Get ProEvery project in every city · from $79/mo
Get Procommercial project · Seattle, WA
Commercial Electrical, Elevator, Fire Protection, Hvac/Mechanical work permitted May 22, 2025, with 11 permits through September 28, 2026, declaring $394,283 of work. Contractor on record: Eco-Tech Mechanical LLC.
THIS IS A REVISION TO ISSUED PERMIT 7101620-FS PER SEATTLE REVIEW COMMENT (Jordon Foster), DELETE PROPOSED GWB DRAFTSTOP, EXTEND UP-SIZED BRANCH TO FEED ADDITIONAL HEAD ON SOUTH SIDE OF MAIN (14) TIMES. AREA OF ALLOWABLE ROLLING PLASTIC TRAY STACKS SHOWN SHADED, 15'-0" BACK FROM BOUNDARY OF UPSIZED & EXISTING BRANCH PIPING.
Seattle permit records name Eco-Tech Mechanical LLC, Archer Construction and JH Kelly, LLC as the contractors on this project, among 9 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
11 permits issued May 22 – Sep 28, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|
#7164568-EL Electrical · Electrical Extend Existing 100a 480v circuit for new equipment We are to disconnect existing equipment and use the existing circuit for new equipment, the connection is in a different spot so we need to extend the circuit length by 10 feet or less Status: Issued | JH Kelly, LLC | — | |
#7145457-EL Electrical · Electrical Replace 100-amp compressor disconnect Status: Completed | Hughes Electrical Contractors Inc | — | |
| applied Feb 18 | #7122032-ME Mechanical · Trade Add Mini Split to Roof Top Elevator Mechanical Room per plans Status: Completed | Eco-Tech Mechanical LLC | $7.5K |
| applied Jan 29 | #7127117-FS Fire Sprinkler and Suppression · Trade THIS IS A REVISION TO ISSUED PERMIT 7101620-FS PER SEATTLE REVIEW COMMENT (Jordon Foster), DELETE PROPOSED GWB DRAFTSTOP, EXTEND UP-SIZED BRANCH TO FEED ADDITIONAL HEAD ON SOUTH SIDE OF MAIN (14) TIMES. AREA OF ALLOWABLE ROLLING PLASTIC TRAY STACKS SHOWN SHADED, 15'-0" BACK FROM BOUNDARY OF… Status: Completed | Archer Construction | $178K |
#7116028-EL Electrical · Electrical Installing 20 cables to 20 different locations for new APs. Replacing 18 existing APs at the site. All voice and data low voltage cabling. Status: Completed | Clearnet Communications | $21.5K | |
| applied Aug 14 | #7101620-FS Fire Sprinkler and Suppression · Trade Upgrade overhead fire sprinkler system per insurance carrier recommendations. Archer Construction's starting point is at the connection to overhead main and branch piping. Status: Completed | Archer Construction | $5.8K |
| applied Sep 10 | #7105924-RF Refrigeration · Trade Add Mini Split to Roof Top Elevator Mechanical Room Status: Completed | Eco-Tech Mechanical LLC | $9.5K |
| applied Apr 28 | #7082863-EL Electrical · Electrical Installation of Initiating and Control Devices on an Existing Fire Alarm System for Fire Life Safety Controls of the Elevator. Status: Completed | Seacom Cabling Inc | $17.8K |
#7099939-EL Electrical · Electrical Walk-in cooler power. Job #876163 Status: Completed | EC Electric | $1K | |
#7093741-EL Electrical · Electrical Update an elevator machine room and hoistway for elevator modernization. Status: Completed | Washington Electrical Contracting LLC | $25K | |
| applied May 22 | #7086914-CY Conveyance · Trade Replace landing system, power unit, controller, and fixtures EQP-SI-05619 / EQP-CY-03095 (2021 SBC=2019 A17.1=2023 NEC/SEC=2020 A18.1) Status: Completed | Olympic Elevator Company | $128K |
In Seattle, biggest first.