Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Seattle, WA
Multifamily Electrical, Elevator, Hvac/Mechanical work permitted January 23, 2025, with 5 permits through October 6, 2025, declaring $297,553 of work. Contractor on record: 16d LLC.
Hydraulic Elevator Modernization including replacement of existing controller, hydraulic tank unit, fixtures, door operating device and door detection device. No underground work required. EQP-CY-06703 / EQP-CY-05258 (2018 SBC = 2020 SEC = 2019 A17.1 = 2017 A18.1)
Seattle permit records name 16d LLC, Active Engineering and Metro Elevator Northwest as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
5 permits issued Jan 23 – Oct 6, newest first.
| Issued | Permit | Contractor | Value |
|---|
Commercial and multifamily, biggest first.
#7110387-EL Electrical · Electrical Install 1 new 40A 208V single phase EV Charger Status: Completed | Active Engineering | $3K | |
| applied Apr 3 | #7073506-ME Mechanical · Trade For the purpose of elevator modernization: Install split unit in existing elevator machine room and adjacent parking garage. Status: Completed | Not published | $9K |
| applied Mar 5 | #7073508-RF Refrigeration · Trade For the purpose of elevator modernization: Refrig permit fo 7075860-ME Status: Completed | 16d LLC | $9K |
#7066974-EL Electrical · Electrical ELECTRICAL FOR ELEVATOR MODERNIZATION. 1/29/25 sk address change Status: Completed | 16d LLC | $11.3K | |
| applied Jan 23 | #7066731-CY Conveyance · Trade Hydraulic Elevator Modernization including replacement of existing controller, hydraulic tank unit, fixtures, door operating device and door detection device. No underground work required. EQP-CY-06703 / EQP-CY-05258 (2018 SBC = 2020 SEC = 2019 A17.1 = 2017 A18.1) Status: Completed | Metro Elevator Northwest | $274K |
In Seattle, biggest first.