Commercial Electrical, Elevator, Sign work permitted December 11, 2024, with 12 permits through September 22, 2026, declaring $525,777 of work. Contractor on record: Mitsubishi Electric US, Inc.
Install new motor, ropes, and load weighing for Car 3. EQP-SI-08088 / EQP-CY-07011 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1)
Seattle permit records name Mitsubishi Electric US, Inc, Macdonald Miller Facility Solutions LLC and Power On Electric LLC as the contractors on this project, among 7 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
12 permits issued Dec 11 – Sep 22, newest first.
| Issued | Permit | Contractor | Value |
|---|
Commercial and multifamily, biggest first.
#7163820-EL Electrical · Electrical Installing heat trace on drain pipe Status: Issued | Macdonald Miller Facility Solutions LLC | — |
| applied Apr 7 | #7136987-CY Conveyance · Trade Replace non-working loadweigh and replace obsolete drive for Car 1. EQP-SI-08088 / EQP-CY-07009 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Issued | Mitsubishi Electric US, Inc | $39.8K |
| applied Apr 7 | #7136988-CY Conveyance · Trade Replace non-working loadweigh for Car 2. EQP-SI-08088 / EQP-CY-07010 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Issued | Mitsubishi Electric US, Inc | $8.4K |
#7133486-EL Electrical · Electrical Replacing 4" recessed lights to 6" recessed lights, adding some more lights, relocating and adding switches. Total 48 lights and 8 switches in the unit. Status: Completed | Power On Electric LLC | — |
| applied Jan 26 | #7125582-SB Sign, Awning and Canopy · Trade Installing a hanging blade sign in place of a current one for a new tenant. Status: Completed | Sign Dog West LLC | $2.3K |
#7122843-EL Electrical · Electrical annual service and load banking stand by generator Status: Issued | NC Power Systems | $2.5K |
| applied Nov 18 | #7117191-CY Conveyance · Trade Install new motor, ropes, and load weighing for Car 3. EQP-SI-08088 / EQP-CY-07011 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Completed | Mitsubishi Electric US, Inc | $347K |
| applied Sep 22 | #7107707-CY Conveyance · Trade Decommission and remove ADA accessibility lift. EQP-SI-08088 / EQP-CY-07012 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Issued | Mitsubishi Electric US, Inc | $7.9K |
| applied Aug 19 | #7102259-CY Conveyance · Trade Replace obsolete drive for Elevator 2 EQP-SI-08088 / EQP-CY-07010 (2021 SBC=2019 A17.1=2023 SEC=2020 A18.1) Status: Completed | Mitsubishi Electric US, Inc | $31.4K |
#7102172-EL Electrical · Electrical For Sixt Rent A Car (Unit R2)-low voltage wiring for intrusion system takeover Status: Completed | Everon LLC | $794 |
#7063014-EL Electrical · Electrical Load bank test one 100kW, 480V, 1500A generator Status: Completed | Pride Electric, Inc | $1.1K |
| applied Dec 4 | #7059198-EL Electrical · Electrical Install 13 wallbox electric vehicle (EV) chargers through out the garage using existing panels [12/11/24 BGO - Fee OK; Approved EVSE Plan Set] Status: Completed | Not published | $85K |