Get Procommercial project · Seattle, WA
Commercial Electrical, Elevator, Fire Protection, Hvac/Mechanical work permitted May 5, 2025, with 10 permits through October 1, 2026, declaring $498,408 of work. Contractor on record: CFM Heating And Cooling Inc.
Modernization installing new machine, governor, rope gripper, controller, Hoistway freight doors, Hall and Car fixtures EQP-SI-05662 / EQP-CY-03197 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1)
Seattle permit records name CFM Heating And Cooling Inc, Man Electric LLC and Macdonald Miller Facility Solutions LLC as the contractors on this project, among 5 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 1 permit issued in the last 30 days is included with Pro.
See the contractorCommercial and multifamily, biggest first.
10 permits issued May 5 – Oct 1, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Sep 15 | #7162727-EL Electrical · Electrical Modification to existing fire alarm system. Installation of (3) new relays and (5) smokes with bases. Status: Issued | Contractor with Pro | $8.7K |
| applied Aug 20 | #7158995-RF Refrigeration · Trade Install refrigeration lines for ductless heat pump Status: Completed | CFM Heating And Cooling Inc | $500 |
#7156841-EL Electrical · Electrical POWER AND CONNECT HEATPUMP Status: Completed | Man Electric LLC | — | |
| applied Dec 23 | #7115070-ME Mechanical · Trade Install 1 ductless split system heat pump and extend existing exhaust system for existing paint booth Status: Completed | CFM Heating And Cooling Inc | $25K |
| applied Jun 11 | #7147290-CY Conveyance · Trade Modernization installing new machine, governor, rope gripper, controller, Hoistway freight doors, Hall and Car fixtures EQP-SI-05662 / EQP-CY-03197 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Status: Issued | Elevator Support Company LLC | $400K |
#7118663-EL Electrical · Electrical Capgemini-114033814-05/06 Access Control System Johnson Controls (JCI) is to uninstall and pack the existing equipment on the third floor and reconnect three elevator readers to the second-floor existing control panel at Capgemini facilities located at 1511 6th Ave, Seattle, WA. JCI will remove… Status: Completed | Not published | $5.7K | |
#7115670-FS Fire Sprinkler and Suppression · Trade Install one sprinkler in a new 10ft x 10ft RF chamber in existing office area. Status: Completed | Fire Systems West | $3K | |
#7114030-EL Electrical · Electrical INSTALL POWER FOR EQUIPMENT Status: Completed | Man Electric LLC | $5K | |
#7100205-EL Electrical · Electrical REPLACE EXISTING DRY COOLER Status: Completed | Macdonald Miller Facility Solutions LLC | $3.5K | |
| applied Mar 28 | #7075929-ME Mechanical · Trade REPLACE (1) DRY COOLER LIKE-FOR-LIKE IN KIND, PER PLAN. Status: Completed | Macdonald Miller Facility Solutions LLC | $47K |