Get ProEvery project in every city · from $79/mo
Get Procommercial project · Seattle, WA
Commercial Electrical, Elevator, Hvac/Mechanical work permitted August 4, 2025, with 9 permits through October 2, 2026, declaring $169,512 of work. Contractor on record: AAA Fire Protection.
Get new commercial permits near 98125 or Seattle, free weekly email
EQP-SI-06003 / EQP-CY-03973 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) TAC 32 Controller, Battery lowering, EP 95 power unit, Shut off, Overspeed Valves, 2 sp fan, 2019 Comms, Car top exit, Wiring & Cables, Car & Hall fixtures with 2019 code req, LD 16 Door operator, interlocks with pickups, cedes door edge, closers, selector and magnets with terminal limits, pit ladder, pit stop switch, pipe stands, toe guard
Seattle permit records name AAA Fire Protection, Vertical Dimensions and B&H Fire And Security, LLC as the contractors on this project, among 6 contractors in all.
9 permits issued Aug 4 – Oct 2, newest first.
| Issued | Permit | Contractor |
|---|
Commercial and multifamily, biggest first.
| Value |
|---|
| applied Oct 2 | #7165430-RF Refrigeration · Trade Install IDU ductless mini in elevator machine service room, run lines out to open-air parking garage to wall mount ODU Status: Issued | Not published | $26K |
#7147756-EL Electrical · Electrical Replace existing ESL FCP with new Potter PFC-4064 and install document box next to fire panel.[CF 8/12/2026 - Building A FACP was replaced] Status: Issued | AAA Fire Protection | — | |
| applied Mar 26 | #7128699-ME Mechanical · Trade Install ductless mini split system in elevator machine service room and run lines to attached parking garage, per plans. Status: Completed | Not published | $27.6K |
| applied Feb 12 | #7128964-CY Conveyance · Trade Elevator cab alterations includes: CEILING with LIGHTING, FLOORING EQP-SI-06003 / EQP-CY-03973 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Weight coming out: 119 lbs Weight going in: 116 lbs Status: Completed | Vertical Dimensions | $10.6K |
#7128982-EL Electrical · Electrical Status: Completed | B&H Fire And Security, LLC | — | |
| applied Feb 10 | #7128695-RF Refrigeration · Trade Install Ductless mini split system in elevator machine service room with running lines to attached parking garage Status: Completed | Not published | $27.6K |
#7126129-EL Electrical · Electrical Electrical upgrades for an elevator modernization to meet current elevator codes. Status: Completed | Merit Electric, Inc. | — | |
| applied Jan 6 | #7122128-CY Conveyance · Trade EQP-SI-06003 / EQP-CY-03973 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) TAC 32 Controller, Battery lowering, EP 95 power unit, Shut off, Overspeed Valves, 2 sp fan, 2019 Comms, Car top exit, Wiring & Cables, Car & Hall fixtures with 2019 code req, LD 16 Door operator, interlocks with… Status: Completed | TK Elevator | $105K |
#7099838-EL Electrical · Electrical ADD ON CELLGUARD TO EXISTING SECURITY ALARM INSTALLATION Status: Completed | Adt LLC | $250 |
In Seattle, biggest first.