Multifamily Electrical, Elevator work permitted June 8, 2026, with 2 permits through September 22, 2026, declaring $46,986 of work. Contractor on record: Vertical Dimensions.
Installation of (5) SimpleSwitch Load Management Systems and (5) 120V Outlets. (3) Raceways w/ pull boxes in the garage [6/8/26 KEF - Plan set approved.] [8/12/26 KEF - Okay (1) additional outlet and SimpleSwitch, (6) total. Original job valuation exceeds adjusted valuation. No fees added.]
Seattle permit records name Vertical Dimensions as the contractor on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
2 permits issued Jun 8 – Sep 22, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Sep 22 | #7163614-CY Conveyance · Trade Elevator cab alterations includes: FLOORING EQP-SI-07793 / EQP-CY-06712 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Weight going in: 36 lbs Weight coming out: 36 lbs |
Commercial and multifamily, biggest first.
Status: Completed
| Vertical Dimensions |
| $5.5K |
| applied May 22 | #7144459-EL Electrical · Electrical Installation of (5) SimpleSwitch Load Management Systems and (5) 120V Outlets. (3) Raceways w/ pull boxes in the garage [6/8/26 KEF - Plan set approved.] [8/12/26 KEF - Okay (1) additional outlet and SimpleSwitch, (6) total. Original job valuation exceeds adjusted valuation. No fees added.] Status: Completed | Not published | $41.5K |
In Seattle, biggest first.