Multifamily Electrical, Hvac/Mechanical work permitted January 14, 2025, with 7 permits through October 14, 2026, declaring $41,379 of work. Contractor on record: Lifetime Heating.
Get new commercial permits near 98116 or Seattle, free weekly email
Replacement of existing G/E roof top unit. (like for like), per plans
Seattle permit records name Lifetime Heating and Active Engineering as the contractors on this project.
The contractor on 1 permit issued in the last 30 days is included with Pro.
See the contractor7 permits issued Jan 14 – Oct 14, newest first.
| Issued | Permit | Contractor | Value |
|---|
Commercial and multifamily, biggest first.
#7167402-EL Electrical · Electrical WE ARE REMODELING A BATHROOM, WE ARE UTILIZING AN EXISTING CIRCUIT THAT WAS FOR A JETTED TUB AND WE ARE GOING TO USE IT FOR A BATH FLOOR HEAT CIRCUIT. WE ARE CHANGING SOME EXISTING LIGHTING. Status: Issued | Contractor with Pro | — | |
| applied Mar 12 | #7118605-ME Mechanical · Trade Replacement of existing G/E roof top unit. (like for like), per plans Status: Completed | Not published | $22.4K |
#7145594-EL Electrical · Electrical Lifetime to replace existing roof top HVAC unit, this is a like for like replacement. tstat connection Status: Issued | Lifetime Heating | — | |
#7145573-EL Electrical · Electrical Lifetime to replace existing roof top HVAC unit, this is a like for like replacement with tstat connection Status: Completed | Lifetime Heating | — | |
| applied Mar 11 | #7074738-EL Electrical · Electrical Install (8) Level 2, 40A, 240V, 1PH, EV Chargers [3/20/25 KEF - Plan set approved.] Status: Completed | Active Engineering | $18K |
#7071076-EL Electrical · Electrical Install (8) Level 2, 40A, 240V, 1PH, EV Chargers [C.Kenefick 3/10/2025 - requires plan review.]; [1/14/26 RN Closed permit, See plan review permit 707]4738-EL] Status: Closed | Active Engineering | $18K | |
#7065138-EL Electrical · Electrical Extend towel warmer circuit and install towel warmer in new bath location. Replace feeder breaker with AFCI/GFCI Status: Completed | Not published | $1K |