Get Procommercial project · Seattle, WA
Commercial General Building, Electrical, Hvac/Mechanical work permitted November 25, 2024, with 13 permits through March 30, 2026, declaring $336,756 of work. Contractor on record: Evergreen Power Systems, Inc.
Get new commercial permits near 98125 or Seattle, free weekly email
Construct tenant improvements in existing commercial building at existing restrooms and 1st floor tenant suite per plan.
Seattle permit records name Evergreen Power Systems, Inc, Region 6 Security and PSR Mechanical as the contractors on this project, among 4 contractors in all.
13 permits issued Nov 25 – Mar 30, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Aug 4 |
Commercial and multifamily, biggest first.
#7089955-CN Addition/Alteration · Building Add and remove antennas and equipment at minor rooftop and ground level telecommunications facility per plan. Status: Issued |
| Not published |
| $40K |
| applied Feb 8 | #7127080-ME Mechanical · Trade Replacement of WSHP-411 like for like STFI (Subject to Field Inspection) Status: Completed | PSR Mechanical | $13.2K |
| applied Aug 5 | #7095119-ME Mechanical · Trade Replace existing WSHP like for like. - Subject to Field Inspection (STFI) Status: Completed | Not published | $9.5K |
#7098053-EL Electrical · Electrical Adding 3 devices Status: Completed | Evergreen Power Systems | $2.2K |
#7097650-EL Electrical · Electrical 20062 - Akin Lobby - add/alter lighting Status: Completed | Evergreen Power Systems, Inc | $3K |
| applied Jun 30 | #7064122-ME Mechanical · Trade Replace (2) existing water source heat pumps. Modify existing hydronic connections and condensate piping as required to replacement WSHP. Status: Completed | Not published | $24.9K |
#7092480-EL Electrical · Electrical Extend existing branch circuit to install new duplex receptacle and hardwire PSU down in basement IDF room. Status: Completed | Region 6 Security | $500 |
#7089999-EL Electrical · Electrical Adding access control to stairwell doors on existing ACS system. Stairwell doors on LL, L2, L3, L4, and L5 will have electrified hardware and card readers installed (five doors total). New control panel will be installed in basement IDF room. We will be pulling the wire. Status: Completed | Region 6 Security | $9K |
#7088793-EL Electrical · Electrical Adding 2 devices Status: Completed | Evergreen Power Systems, Inc | $2.2K |
#7086039-EL Electrical · Electrical 20062 - Akin Restrooms - add/alter lighting, switches Status: Completed | Evergreen Power Systems, Inc | $2K |
| applied Apr 2 | #7075770-CN Addition/Alteration · Building Construct tenant improvements in existing commercial building at existing restrooms and 1st floor tenant suite per plan. Status: Issued | Not published | $200K |
#7060181-EL Electrical · Electrical Network Cabling Installation Status: Completed | SABER Technologies | $22K |
| applied Nov 22 | #7057013-ME Mechanical · Trade Misc duct and GRD modifications Status: Completed | Not published | $8.3K |