Commercial General Building work permitted June 12, 2025, with 30 permits through August 25, 2026, declaring $7,168,514 of work. Contractor on record: Dome Construction Corp.
Get new commercial permits near 94105 or San Francisco, free weekly email
20th/f t.i. demo & new construction of non-structural partitions, doors, finishes, & lighting. ada upgrade at core restrooms, phone booth structural drawings. no change to fixture counts, occupancy loads, or path of traval, mep deferred
San Francisco permit records name Dome Construction Corp, R M I Mechanical Contractors and Bilcor Inc as the contractors on this project, among 7 contractors in all.
30 permits issued Jun 12 – Aug 25, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jul 15 | #202607155067 otc alterations permit |
Commercial and multifamily, biggest first.
ti suite 1100: demo and replacement of ceiling system. lighting, casework and finishes, demo of some partitons, new full height partitions, modification mep upgrades
Status: Issued
| Skyline Construction |
| $1M |
| applied May 28 | #202605282043 otc alterations permit 20/f: install (1) cornell call station and signage. two way call station to integrate with bldg two way emergency communication. system backbone infrastructure permit 202008292919. architectural ref permit 202008292919 and 202604038850. Status: Complete | Bilcor Inc | $6K |
| applied May 20 | #202605201601 otc alterations permit 12/fl- ref 202604018691- add tranfer fan, ceiling supply diffusers and return air grilles, ductwork, relocate thermostats and air balance Status: Complete | R M I Mechanical Contractors | $10K |
| applied Apr 1 | #202604018691 otc alterations permit 12th fl, ste 1250 consist of demo & new construction of non-structural partition walls, doors, finishes, lighting & millwork. mep to be deferred submittal. no change to fixture quantities, occupancy loads, or path of travel (pa 202602135931). restroom ada compliance under pa 202512172039 Status: Complete | Dome Construction Corp | $199K |
| applied Apr 23 | #202604239966 otc alterations permit 20th floor: office tenant retrofit, lighting fixtures and associated circuiting/constrols power and signal devices and associated wiring. ref app #202602266597 and 202604038850 Status: Complete | Dome Construction Corp | $407K |
| applied Apr 23 | #202604239969 otc alterations permit 22nd floor: office tenant retrofit, lighting fixtures and associated circuiting/constrols power and signal devices and associated wiring. ref pa#202602266610 and 202604038844 Status: Complete | Dome Construction Corp | $417K |
| applied Apr 23 | #202604239956 otc alterations permit 22nd floor add 2 water cooled heat pumps, add 2 transfer fans, relocate on vav box, add supply diffusers & return air grilles. new ductwork, new condenser water piping, new heat pump thermostats, relocate vav thermostats, and air balancing. ref bldg permit # 202602266610. Status: Complete | R M I Mechanical Contractors | $250K |
| applied Apr 23 | #202604239967 otc alterations permit 20/f: relocate one water cooled heat pump, add one transfer fan, relocate one vav box, add supply diffusers and return air grilles. new ductwork, new condenser water piping, relocate thermostats and air balancing. ref bpa 202602266597 Status: Complete | R M I Mechanical Contractors | $200K |
| applied Apr 3 | #202604038850 otc alterations permit revision to pa 202602266597 ste 2000 demo & construction of new non-structural partitions & new ceilings. no change to fixture counts, path of travel ref pa 202602135931 Status: Complete | Dome Construction Corp | — |
| applied Apr 3 | #202604038844 otc alterations permit revision to pa 202602266610 ste 2200 & 2250 additional demo & construction of new non-structural partitions & new ceilings Status: Complete | Dome Construction Corp | $2K |
| applied Mar 23 | #202603238112 otc alterations permit 12/f suite 1275-1285: as-built for fire sprinkler bpa 202602125832. update drawings for adjusted piping plan. ref t.i 202512171960 Status: Complete | Ayoob & Peery Plumbing Co Inc | — |
| applied Mar 17 | #202603177684 otc alterations permit suite 2450a: def mechanical & electrical for 202602135931. Status: Issued | Source Planning And Construction Inc | $130K |
| applied Mar 12 | #202603127451 otc alterations permit suite 1200, 1275, 1285, 1300. 12th and 13th flr. as built: 202602125819 11 new speaker strobes on 12th floor 6 new speaker strobes on 13th floor Status: Complete | Bilcor Inc | $16.3K |
| applied Feb 26 | #202602266597 otc alterations permit 20th/f t.i. demo & new construction of non-structural partitions, doors, finishes, & lighting. ada upgrade at core restrooms, phone booth structural drawings. no change to fixture counts, occupancy loads, or path of traval, mep deferred Status: Complete | Dome Construction Corp | $1.6M |
| applied Feb 26 | #202602266610 otc alterations permit 22nd flr: interior demolition & new construction of non-structural partitions, door, finishes, & lighting. ada upgrades to the core restrooms. no changes to fixture counts. occupant loads, or path of travel. ref pa #202602135931. mep to be under deffered submittal. new phone booth structural drawing Status: Complete | Dome Construction Corp | $1.1M |
| applied Feb 12 | #202602125833 otc alterations permit 13/f suite 1300: add (12). relocate (15) fire sprinkler per ti. ref permit 202512171962. Status: Complete | Ayoob & Peery Plumbing Co Inc | $16.8K |
| applied Feb 13 | #202602135931 otc alterations permit 24th fl suite 2450a: minor demolition of non structural elements including partitions, finishes, ceilings & lighting. construction of new office fronts and doors, same lobby, vestibule and lighting. includes restroom accessibility upgrades and building path of travel. mech & electrical on sep permit Status: Issued | Source Planning And Construction Inc | $400K |
| applied Feb 12 | #202602125832 otc alterations permit 12/f suite 1275-1285: add (8). relocate (19) fire sprinkler per ti. ref permit 202512171960. Status: Complete | Ayoob & Peery Plumbing Co Inc | $16.8K |
| applied Feb 12 | #202602125834 otc alterations permit unit 1200: add 3 relocate 11 fire sprinkler per t.i. ref app #202512172039 Status: Complete | Ayoob & Peery Plumbing Co Inc | $8.7K |
| applied Feb 12 | #202602125819 otc alterations permit suite 1200, 1275, 1285, 1300. install (11) ceiling mount speaker-strobes. suite 1300 arch ref#: 202512171962. relocate (3) ceiling mount speaker strobes. suite arch ref#: 202512172039. suite 1275 and 1285. 202512171960. Status: Complete | Bilcor Inc | $13.4K |
| applied Feb 11 | #202602115722 otc alterations permit ste 1215-1285 - add 1 transfer fan, add diffusers, add registers & grilles, new ductwork, air balance and relocate thermostat. ref pa 202512171960 Status: Complete | R M I Mechanical Contractors | $45K |
| applied Feb 11 | #202602115724 otc alterations permit ste 1200 - add 1 transfer fan, relocate 1 box, add diffusers, add registers & grilles. new ductwork, air balances and relocate thermostats. ref pa 202512172039 Status: Complete | R M I Mechanical Contractors | $22.5K |
| applied Feb 11 | #202602115725 otc alterations permit ste 1300 - add 1 transfer fan, relocate 1 vav box and add diffusers, add registers & grilles, new ductwork, air balance, and relocate thermostats. ref pa 202512171962 Status: Complete | R M I Mechanical Contractors | $35K |
| applied Dec 17 | #202512172039 otc alterations permit 12th fl, suite 1200. interior demolition of non structural elements including but not limited to interior partitions, doors, finishes, and lighting. construction of break millwork, storage, lighting, finishes. also includes restroom ada accessibility upgrades. mep under sep permit Status: Complete | Dome Construction Corp | $233K |
| applied Dec 17 | #202512171960 otc alterations permit 12/f suite 1275 and 1285: interior non-structural demo. construction of new demising walls, conference, break area, and office, ceilings, lighting and finishes. mep deferred. work does not affect fixture quantities, occupant load calcs or path of travel. no exterior work. Status: Complete | Dome Construction Corp | $497K |
| applied Dec 17 | #202512171962 otc alterations permit 13/f suite 1300: interior non-structural demo. construction of interior partitions, doors, finishes. mep deferred. work does not affect fixture quantities, occupant loads or path of travel. no exterior work. Status: Complete | Dome Construction Corp | $450K |
| applied Aug 5 | #202508052297 otc alterations permit suite 2570. ref ti 202507171000- install (2) ceiling mount speaker strobes Status: Issued | Bilcor Inc | $1.3K |
| applied Jul 25 | #202507251627 otc alterations permit ste 2570 - relocate 1 pendent, add 1 pendent ref pa 202507171000 Status: Issued | Pioneer Fire Inc. | $500 |
| applied Jul 17 | #202507171000 otc alterations permit 25th fl: installation of life safety and seismic requirements for (2) phone booths in and existing office. does not affect existing layout occupancy or egress. path of travel under previously approved pa # 2023-0307-3171. restroom under 2022-0913-2378.(no mech-e) Status: Complete | Not published | $25K |
| applied Jun 12 | #202506128627 otc alterations permit to comply with nov# 202538027 - repair walls within stairway #2 from floors 4-24 due to water damage, non-structural work. inkind Status: Complete | Source Planning And Construction Inc | $20K |