Commercial General Building work permitted February 28, 2025, with 19 permits through October 29, 2026, declaring $10,347,773 of work. Contractor on record: Skyline Construction.
17/f: full floor t.i including new partitions, ceilings, finishes and fixtures mep deferred.
San Francisco permit records name Skyline Construction, Matrix Hg Inc and R L H Fire Protection Inc as the contractors on this project, among 5 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 1 permit issued in the last 30 days is included with Pro.
See the contractor19 permits issued Feb 28 – Oct 29, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|
| applied Aug 27 | #202608277310 otc alterations permit level 9: interior ti includes limited soft demo, buildi out includng new millwork and mep Status: Issued | Contractor with Pro | $157K |
| applied Jul 2 | #202607024490 otc alterations permit mep deferred. 5/f: tenant space, construct two new partitions w/ new door, relocated sink within new millwork. re-install relocated door frames and hardware. install associated power, data and modify (e) acoustic ceiling tiles as required for new scope of work. Status: Issued | Gci, Inc | $142K |
| applied Apr 8 | #202604089072 otc alterations permit 26/f: replace the (e) general exhaust fan, ef-3, located on the 26th floor of one maritime plaza, with a 31,200 cfm variable - volume exhaust fan to increase tenant exhaust airflow capacity. the exhaust riser will be reused. Status: Issued | Matrix Hg Inc | $90K |
| applied Feb 5 | #202602055326 otc alterations permit 19th fl - deferred mep for bpa 202509044565 Status: Issued | Skyline Construction | $523K |
| applied Feb 5 | #202602055325 otc alterations permit 18th fl - deferred mep for bpa 202508153152 Status: Issued | Skyline Construction | $1.2M |
| applied Feb 5 | #202602055322 otc alterations permit 17th fl - deferred mep for bpa 202508153152 Status: Issued | Skyline Construction | $1.3M |
| applied Dec 12 | #202512121716 otc alterations permit 19th fl: partial ti revision to 202509044565.deferred clarification to dph for use of butler pantry area 19303. removal of pantry equipment from scope. Status: Issued | Skyline Construction | — |
| applied Oct 28 | #202510288277 otc alterations permit interconnecting accessory (non-egress) stairs between levels 18 and 19. Status: Issued | Skyline Construction | $113K |
| applied Nov 19 | #202511199999 otc alterations permit t.i. fire sprinkler. relocate 61, add 14, delete 5 fire sprinklers. Status: Complete | R L H Fire Protection Inc | $24K |
| applied Oct 31 | #202510318693 otc alterations permit 18th fl- ti fire sprinkler. relocate 153, add 17. delete 38 fire sprinklers. ref pa # 2025-0815-3151 Status: Issued | R L H Fire Protection Inc | $50K |
| applied Oct 31 | #202510318691 otc alterations permit 17th fl- ti fire sprinkler. relocate 148, add 8. delete 21 fire sprinklers. ref pa # 2025-0815-3152 Status: Complete | R L H Fire Protection Inc | $45K |
| applied Sep 4 | #202509044565 otc alterations permit 19th/f: partial floor t.i. included new partitions, ceiling, finishes, & fixtures. mep deferred Status: Issued | Skyline Construction | $1.1M |
| applied Aug 15 | #202508153151 otc alterations permit 18/f: full floor t.i including new partitions, ceilings, finishes and fixtures mep deferred. Status: Issued | Skyline Construction | $2.5M |
| applied Aug 15 | #202508153152 otc alterations permit 17/f: full floor t.i including new partitions, ceilings, finishes and fixtures mep deferred. Status: Issued | Skyline Construction | $2.6M |
| applied Sep 16 | #202509165351 otc alterations permit revision to pa# 202502261091: removing the work on the east entrance from the scope of work. Status: Complete | Hathaway Dinwiddie Co. | — |
| applied Aug 27 | #202508273987 otc alterations permit ref ti 202502261091- provide (n) lighting, branch circuiting to (e) panel, (n) power and signal and branch circuit to (e) panel. provide title 24 compliance forms. Status: Complete | Hathaway Dinwiddie Co. | $8.7K |
| applied Jun 16 | #202506168732 otc alterations permit add (3) overhead electric heaters in an existing outdoor dining area for an existing restaurant. Status: Complete | Matrix Hg Inc | $36.8K |
| applied Feb 26 | #202502261091 otc alterations permit remove existing west entrance door of the bar sprezzatura on plaza level. install a new revolving door with power assist, automated pivot door on west entrance. remove e east entrance door of the bar sprezzatura, new pivot door with power assist. Status: Complete | Hathaway Dinwiddie Co. | $493K |
| applied Feb 13 | #202502130235 otc alterations permit fire sequence change. revision to pa#2024-0724-7142 Status: Issued | Matrix Hg Inc | $13.8K |
In San Francisco, biggest first.