Commercial General Building work permitted December 20, 2024, with 26 permits through September 1, 2026, declaring $10,378,798 of work. Contractor on record: Vulcan Construction Inc.
Get new commercial permits near 94111 or San Francisco, free weekly email
25th fl,ste 2500 -ti includes demo of non structural partitions & building new non structural partitions.(n) operable partition; upgrades incude (n) millwork, lighting & finishes throuhgout. all (n) or revised meps under separate permmit. bldg fully sprinklered. (life
San Francisco permit records name Vulcan Construction Inc, Siemens Industry, Inc. and Principal Builders Inc. as the contractors on this project, among 11 contractors in all.
26 permits issued Dec 20 – Sep 1, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Aug 18 | #202608186791 |
Commercial and multifamily, biggest first.
otc alterations permit
demo only permit of level 28 and partial floor 27 (ab-017)
Status: Issued
| M C S Construction Services |
| $30K |
| applied Aug 28 | #202608287330 otc alterations permit ste 2350- mep deferred for bpa: 202607104811. new lights, new outlets, new floor monuments, new vav to supply new offices. Status: Complete | Vulcan Construction Inc | $75K |
| applied Jul 20 | #202607205243 otc alterations permit 27/f: (e) full fl office suite demised into 2 suites. scope includes: demo and construction of common area and restroom, non-structural partitions, ceilings, doors, millwork and finishes. no change in occupancy, use or area. Status: Issued | M C S Construction Services | $510K |
| applied Jul 10 | #202607104811 otc alterations permit suite 2350. remodel existing tenant suite, demo of lighting and finishes, construction of non structural partitions, ceilings, lighting, and finishes. no new plumbing fixtures. mep deferred. Status: Complete | Vulcan Construction Inc | $95.3K |
#202606032438 otc alterations permit 8/f: installing transfer grills and replacing lights. (deferred mep for pa# 202603107215) Status: Complete | Vulcan Construction Inc | $75K |
| applied Mar 19 | #202603197880 otc alterations permit 16th fl mechanical and electrical work for ti ref pa 202601214196 Status: Complete | Skyline Construction | $140K |
| applied Apr 3 | #202604038817 otc alterations permit floor 25;fire only to obtain "as-built" permit for the fire alarm addtions with the floor 25 allen matkins remodels. initial fire alarm pa#: 202511129336. Status: Complete | Siemens Industry, Inc. | — |
| applied Mar 10 | #202603107215 otc alterations permit 8/f: interior demolition of non-structural partitions, doors, millwork, ceilings, flooring, finishes, hvac, electrical, plumbing & equipment. restroom remodel. new demising tenant partitions and tenant suite doors. new common corridor and elevator lobby finishes and ceiling. Status: Complete | Vulcan Construction Inc | $300K |
| applied Jan 21 | #202601214196 otc alterations permit 16/fl-scope of work includes creating (2) spec suites(1630 & 1650) demo of non structural interior partitons, doors, finishes, ceilings and lighting. new consruction includes non-structural partitons, doors, ceilings,lighting, plumbing, and finishes. fls and mep deferred. Status: Complete | Skyline Construction | $827K |
| applied Jan 7 | #202601073346 otc alterations permit install 1 call station for elevator lobby. install 1 call station signage. 2 way ecs permanent backbone infrastrcture permit. 202009033421. 25th fl architectural 202507160935. Status: Complete | Bilcor Inc | $6K |
| applied Dec 19 | #202512192290 otc alterations permit suite p2: install lighting control, power outlets & devices, new distribution panel. deferred electrical for t.i. 202510157369 Status: Complete | Mc Millan Electric | $80K |
| applied Dec 12 | #202512121673 otc alterations permit suite 2500. revision to 202507160935. clarifying the door's hardware etec for the egress. door number 2512. Status: Complete | Principal Builders Inc. | — |
| applied Dec 16 | #202512161905 otc alterations permit deffered permit for ref ti 202510157369- for mep to include relocate of air duct and registers. Status: Complete | Vulcan Construction Inc | $10K |
| applied Dec 11 | #202512111477 otc alterations permit fire work only for the promenade level remodel done under pa#: 202510157369; 1 speaker and 2 speaker/strobes are added, and 3 speaker/strobes are relocated. Status: Complete | Siemens Industry, Inc. | $5.6K |
| applied Nov 18 | #202511189847 otc alterations permit fire sprinkler ti - relocate 3 pendents in suite p-2 on the promenade level. ref ti# 202510157369 Status: Complete | Golden Gate Fire Protection Inc | $2K |
| applied Nov 7 | #202511079164 otc alterations permit 22nd fl ref pa # 2025-1105-8998: relocate 6 pendent sprinklers and add 1 Status: Complete | Golden Gate Fire Protection Inc | $3.7K |
| applied Nov 5 | #202511058998 otc alterations permit 22nd fl new interior partitoins, ceilings, finishes. mep deferred Status: Issued | Skyline Construction | $190K |
| applied Nov 12 | #202511129336 otc alterations permit 25th fl - fire work only for suite 2500 remodel done under pa 202507160935; additions are 13 smoke detectors, 9 duct detectors, 2 pull stations, 9 modules, 44 speaker/strobes, 55 speakers and 3 strobes Status: Complete | Siemens Industry, Inc. | $132K |
| applied Oct 15 | #202510157369 otc alterations permit promenade level consists of demolition of non structural partition, millwork, lighting and finishes. construction of non structural partitions, ceilings, lighting and finishes. no change in occupancy, use or area. mep deferred. Status: Complete | Vulcan Construction Inc | $293K |
| applied Sep 26 | #202509266164 otc alterations permit 25/f suite 2500: fire sprinkler t.i. relocate 222. ref permit 202507160935. Status: Complete | Anderson, Rowe & Buckley, Inc. | $138K |
| applied Aug 26 | #202508263861 otc alterations permit 26th fl ref pa # 2025-0623-9229: fire only work. addition of 2 speaker/strobes Status: Complete | Siemens Industry, Inc. | $1.9K |
| applied Aug 7 | #202508072596 otc alterations permit 25/f, ste 2500. ref arch set #202507160935. mep for this project. Status: Complete | Principal Builders Inc. | $2.9M |
| applied Aug 14 | #202508143034 otc alterations permit 26th/f: relocate 13 pendents, ref to t.i. 202506239229 Status: Complete | Pioneer Fire Inc. | $4.8K |
| applied Jul 16 | #202507160935 otc alterations permit 25th fl,ste 2500 -ti includes demo of non structural partitions & building new non structural partitions.(n) operable partition; upgrades incude (n) millwork, lighting & finishes throuhgout. all (n) or revised meps under separate permmit. bldg fully sprinklered. (life Status: Complete | Principal Builders Inc. | $3.7M |
| applied Jun 23 | #202506239229 otc alterations permit 26/f: installation of new non-structural partitions & glazing for new multipurpose room, conference room, & catering counter space. Status: Complete | Principal Builders Inc. | $958K |
| applied Dec 11 | #202412116604 otc alterations permit lobby level: revision to pa #202307031429 to clarify confernce center is a-2 assembly not a-3 assembly to accommodate sffd permanent place of assembly function. no revision to constructed scope of work. Status: Issued | Hathaway Dinwiddie Co. | — |