Get ProEvery project in every city · from $79/mo
Get Procommercial project · San Diego, CA
Commercial Electrical, Mep, Solar work permitted March 25, 2025, with 3 permits through October 22, 2025. Contractor on record: Stellar Solar.
· (14) CANADIAN SOLAR CS6.1-54TM-450H MODULES · (14) ENPHASE IQ8HC-72-M-US MICROINVERTERS · (1) ENPHASE IQ COMBINER 6C · (1) ENPHASE IQ BATTERY 10C · (1) ENPHASE IQ METER COLLAR · NEW NEMA 240V OUTLET · 6.30 KW DC / 5.79 KW CEC AC SYSTEM SIZE
San Diego permit records name Stellar Solar, Swinson Electric and Bill Howe as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
3 permits issued Mar 25 – Oct 22, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
In San Diego, biggest first.
#PMT-3382521 Photovoltaic - SB 379 · (14) CANADIAN SOLAR CS6.1-54TM-450H MODULES · (14) ENPHASE IQ8HC-72-M-US MICROINVERTERS · (1) ENPHASE IQ COMBINER 6C · (1) ENPHASE IQ BATTERY 10C · (1) ENPHASE IQ METER COLLAR · NEW NEMA 240V OUTLET · 6.30 KW DC / 5.79 KW CEC AC SYSTEM SIZE Status: Closed |
| Stellar Solar |
| — |
| applied Apr 8 | #PMT-3347130 No-Plan - Nonresidential/Multifamily - Electrical Upgrade ele service to 200 amps Status: Closed | Swinson Electric | — |
| applied Mar 25 | #PMT-3344826 No-Plan - Residential - Combination Mech/Elec/Plum Replace A/C Unit, Furnace, Coil and Installed Duct Work GREATER than 40 ft. Status: Issued | Bill Howe | — |