Issued Mar 3 · 26 permits
$6.1M
RANCHO BERNARDO: Building/Mechnical/Electrical/Plumbing/PVS/Fire Supression Permits: One-Step Master Plan Establishment for 3 Bldg. types, Comprised of 6 Floor plans for a total…
Get ProEvery project in every city · from $79/mo
Get ProMonthly permit report
By declared value.
Issued Mar 3 · 26 permits
$6.1M
RANCHO BERNARDO: Building/Mechnical/Electrical/Plumbing/PVS/Fire Supression Permits: One-Step Master Plan Establishment for 3 Bldg. types, Comprised of 6 Floor plans for a total…
Issued Mar 10 · 6 permits
$3.7M
A proposed partial floor tenant improvement on the 6th floor of an existing office building (Suite 600). Work to include selective demolition of…
Source: building permit records from official city open-data portals, checked daily. Data through . How we count
Issued Mar 3 · 6 permits
$1.8M
Proposed tenant improvement at 6th floor of an existing 34-story building. Scope of work to include non bearing partitions, lighting, hvac.
Issued Mar 11 · 2 permits
$1.6M
8’ fence = 1,837 LF (with gates) = 1,638 LF (w/o gates) 5’ fence over (E) 3’ height wall = 195 LF 10’ fence around (E) vents = 210 LF
Issued Mar 17 · 6 permits
$1.4M
for the proposed tenant improvement with structural store front replacement to9 an existing multistory commercial building. Discretionary: PTS 277550
Issued Mar 31 · 5 permits
$1.4M
Proposed TI on (E) office building. The work to include (N) Interior non-load bearing partitions, ceiling, door, fixtures and finishes. demo of the walls. No new plumbing.
Issued Mar 26 · 2 permits
$1.2M
For an interior remodel of 14-story MDU. Work to include accessibility improvements, laundry and other amenities remodel.
Issued Mar 14 · 4 permits
$1M
For interior tenant improvements to an (E) single-story commercial building. Work to include modifications to non-bearing walls, equipment, and fixtures.
Issued Mar 6 · 4 permits
$1M
SDIA-T2W- PHASE 3. THE REPLACEMENT OF ALL SYSTEMS WITH THREE DEDUCTIVE ALTERNATIVES FOR MECHANICAL HEATING HOT WATER, MECHANICAL CHILLED WATER, DOMESTIC HOT WATER AND…
Issued Mar 10 · 6 permits
$981K
MIRA MESA - *LIFE SCIENCE - Tier 3* - Building, Mechanical, Electrical, and Plumbing permits on the second-level existing commercial building. Work will include office and lab…
Other months: September 2026 · August 2026 · July 2026 · June 2026 · May 2026 · April 2026