Get ProEvery project in every city · from $79/mo
Get Procommercial project · San Diego, CA
Commercial Electrical, Solar work permitted November 19, 2024, with 2 permits through October 6, 2025. Contractor on record: Stellar Solar.
1. (15) CANADIAN SOLAR CS6.1-54TM-450H MODULES 2. (1) TESLA POWERWALL 3 BATTERY + INVERTER 3. (1) TESLA BACKUP SWITCH 4. (1) E-STOP SYSTEM RAPID SHUTDOWN SWITCH 5. (1) BATTERY / PV DISCONNECT 6. 6.75 kW DC / 6.24 KW CEC AC SYSTEM SIZE
San Diego permit records name Stellar Solar and Jesse Jokerst as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
2 permits issued Nov 19 – Oct 6, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Oct 6 | #PMT-3379294 Photovoltaic - SB 379 1. (15) CANADIAN SOLAR CS6.1-54TM-450H MODULES 2. (1) TESLA POWERWALL 3 BATTERY + INVERTER 3. (1) TESLA BACKUP SWITCH 4. (1) E-STOP SYSTEM RAPID SHUTDOWN SWITCH 5. (1) BATTERY / PV DISCONNECT 6. 6.75 kW DC / 6.24 KW CEC AC SYSTEM SIZE |
In San Diego, biggest first.
Status: Closed
| Stellar Solar |
| — |
| applied Nov 15 | #PMT-3323243 No-Plan - Nonresidential/Multifamily - Electrical Status: Issued | Jesse Jokerst | — |