Commercial Hvac/Mechanical work permitted March 13, 2025, declaring $50,000 of work. Contractor on record: The Franklin Co Cont Inc.
Get a free email when a new permit is filed here
- $50K
- Project value
- 1
- Permit
- Mar 13
- First permit
- 44 days
- Application to issuemedian
What's being built
FUEL STORAGE IN CONJUNCTION WITH EMERGENCY GENERATOR JOB # M00920569-I1
Who is building at 419 East 91 Street Manhattan?
New York City permit records name The Franklin Co Cont Inc as the contractor on this project.
On file for this address
- A contractor phone number
One charge, nothing renews. Refunded in full if the record lacks what’s listed here.
Permits at 419 East 91 Street Manhattan
1 permit, issued Mar 13.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jan 28 | #M00920569-S2-BE Boiler Equipment · Initial Permit FUEL STORAGE IN CONJUNCTION WITH EMERGENCY GENERATOR JOB # M00920569-I1 Status: Signed-Off | The Franklin Co Cont Inc | $50K |
Other projects in 10128
Commercial and multifamily, biggest first.
- 288 East 88 Street ManhattanNew 24 Story Mixed Use BuildingmultifamilyBuilding, HVAC / Mechanical, Plumbing· Leeding Builders Group LL$10.7MDec 10
- 1395 Lexington Avenue ManhattanPHASE 3.3: Partial int. fitout including dismantling/installation of non-load bearing walls, doors, ceiling, floors, finishes, exterior repairs and glazing. Replace existing…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Richter & Ratner Contract$4.8MMay 19
- 50 East 87 Street ManhattanMechanical work associated with the proposed renovation, as shown on plans filed herewith. No change to use, egress or occupancy.commercialBuilding, HVAC / Mechanical· Yorke Construction Corp$4.1MAug 21
- 1641 3 Avenue ManhattanPARKING GARAGE REPAIRS & REHABILITATION NO CHANGE IN USE EGRESS OR OCCUPANCYmultifamilyBuilding· D-Best Industires Corp$4MAug 1
- 1107 Fifth Avenue ManhattanRenovation of existing apartment unit on the 12 floor.multifamilyBuilding· Highline Construction GR$3.7MApr 11
- 60 East 93 Street ManhattanConversion of a mixed-use building to a single-family home. A new certificate of occupancy will be obtained.commercialBuilding· Highline Construction GR$3.6MSep 18
More projects by The Franklin Co Cont Inc
In New York City, biggest first.
- 4360 Broadway ManhattanModular air cooled heat pump chillers added to building perimeter radiation system, and split system air-cooled heat pump system. Replace unit heaters and convectors, and…commercialBuilding, Electrical, Fire protection, HVAC / Mechanical, Plumbing· Vital Plumbing, Inc$25MApr 28
- 259 Convent Avenue ManhattanREMOVAL OF EXISTING 275GAL FUEL OIL TANK, INSTALLATION OF A NEW 275GAL FUEL OIL TANK CONNECTED TO EXISTING EMERGENCY GENERATOR AT SHEPARD HALL, AND INSTALLATION OF 275GAL…commercialHVAC / Mechanical· The Franklin Co Cont Inc$370KApr 6
- 3223 Glenwood Road BrooklynREPLACE BOILER AND BURNER.multifamilyBuilding, HVAC / Mechanical· Guaranteed Home Improveme$250KJun 22
- 585 Schenectady Avenue BrooklynINSTALL TEMPORARY BOILER STACK, STEAM, CONDENSATE & MAKE-UP WATER PIPING CONNECTED TO TWO TEMPORARY BOILER TRAILERS TO PROVIDE HEAT TO THE BUILDING. INSTALLATION OF HIGH-PRESSURE…commercialBuilding, HVAC / Mechanical· The Franklin Co Cont Inc$220KJun 23
- 2150 Mill Avenue BrooklynINSTALL NEW DIESEL-POWERED EMERGENCY GENERATOR WITH SUB-BASE FUEL TANK ON ELEVATED CONCRETE PLATFORM ABOVE FLOOD ELEVATION.commercialHVAC / Mechanical· PSG Construction Co.,Inc$160KMay 21
- 224 West 47 Street ManhattanHEREBY FILING FOR FUEL STORAGE TANK FOR EMERGENCY GENERATOR WORK. THIS APPLICATION IS FILED IN CONJUNCTION WITH ALT 1 # 122106318commercialHVAC / Mechanical· The Franklin Co Cont Inc$150KApr 4