Get ProEvery project in every city · from $79/mo
Get Procommercial project · New York City, NY
Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical, Plumbing work permitted April 14, 2025, with 7 permits through April 28, 2025, declaring $25,040,322 of work. Contractor on record: Neelam Construction Corp.
Modular air cooled heat pump chillers added to building perimeter radiation system, and split system air-cooled heat pump system. Replace unit heaters and convectors, and building exhaust fans and ductwork. This project will require commissioning.
New York City permit records name Neelam Construction Corp, Vital Plumbing, Inc and The Franklin Co Cont Inc as the contractors on this project, among 4 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
7 permits issued Apr 14 – Apr 28, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|
| applied May 8 | #M00984880-S5-BE Boiler Equipment · Initial Permit Remove and replace existing generator main fuel oil tank with new to accommodate new electrical room in cellar. Status: Permit Issued | The Franklin Co Cont Inc | $2.9M |
| applied May 8 | #M00984880-S4-EW-SP Sprinklers · Initial Permit Drawings are for sprinkler work only. System designed per NFPA 13 and BC Appendix Q. Remove and replace existing stage deluge system up to isolation valve. Replace all sprinkler heads and reconnect DCDA. Partial shutdown with fire watch as per FC-901. Status: Permit Issued | Vital Plumbing, Inc | $31.2K |
| applied May 9 | #M00984880-I1-MS Mechanical Systems · Initial Permit Modular air cooled heat pump chillers added to building perimeter radiation system, and split system air-cooled heat pump system. Replace unit heaters and convectors, and building exhaust fans and ductwork. This project will require commissioning. Status: Permit Issued | Tameer Inc | $13.5M |
| applied May 7 | #M00984880-S6-GC General Construction · Initial Permit Remove and replace ceiling on cafeteria alongside first, second, and third floor corridors. Remove portions of exterior wall for HVAC access. Install new partitions in cellar to make new rooms. Replace all windows and install new window shades. Status: Permit Issued | Neelam Construction Corp | $5.6M |
| applied May 8 | #M00984880-S7-ST Structural · Initial Permit Structural work to support electrification project at the building. Includes new steel rooftop dunnage and new slab openings for MEP runs. Status: Permit Issued | Neelam Construction Corp | $1.3M |
| applied May 8 | #M00984880-S1-PL Plumbing · Initial Permit Completely remove existing gas piping. Remove and replace existing cold water service piping and booster pump. Remove existing gas fired hot water heater. Provide skid-mounted heat pump hot water heater, with 2 heat pumps and 1 electric storage tank. Status: Permit Issued | Vital Plumbing, Inc | $508K |
| applied May 8 | #M00984880-S9-GC-CX Earth Work · Initial Permit The installation of a new ConEdison transformer vault. Electrical service from the vault to the building including trenching and site restoration. Status: Permit Issued | Neelam Construction Corp | $1.3M |
In New York City, biggest first.