Get ProEvery project in every city · from $79/mo
Get Procommercial project · Minneapolis, MN
Commercial General Building, Hvac/Mechanical, Plumbing work permitted November 15, 2024, with 25 permits through June 29, 2026, declaring $6,537,100 of work. Contractor on record: Metropolitan Mechanical Contractors Inc.
Get new commercial permits in Minneapolis, free weekly email
BUILDING WORK RELATED TO REPLACING EQUIPMENT 2020 MSBC architect: 49978 - Anderson, James Charles @ EAPC
Minneapolis permit records name Metropolitan Mechanical Contractors Inc, Mortenson Construction and M . A . Mortenson as the contractors on this project.
25 permits issued Nov 15 – Jun 29, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
In Minneapolis, biggest first.
#BLDG1182203 Mechanical · ComMFDNR Adding to CT scanner to existing space. Adding 2 vav boxes and low-pressure ducts. Addition work includes adding 2 hydronic pumps, 1 air separator, 1 expansion tank, 1 heat exchanger. Additional mechanical piping on levels 1,2,and 3. refer to plans for sp Status: Issued |
| Metropolitan Mechanical Contractors |
| $102K |
#BLDG1181857 Commercial · Remodel east building second floor - remodeling nuclear and CT scanner rooms. certificate of occupancy required no const type: 1a occupancy: I2 2020 MSBC sprinklered: yes architect: anderson #49978 EAPC architects SAC Status: Issued | Mortenson Construction | $1.1M |
#BLDG1182232 Plumbing · ComMin Med Gas piping, sanitary and domestic water to (1) sink Status: Closed | Metropolitan Mechanical Contractors | — |
#BLDG1173640 Plumbing · ComMin fairview riverside. 10 floor locker room upgrade Status: Closed | Metropolitan Mechanical Contractors | — |
#BLDG1169665 Mechanical · ComMFDNR Installing 2 VAVs from existing main duct with reheats and modifying exhaust ducts for shower/change room M1003-1 and shower/change room 1003 BLDG11696 Work is located on level10 1 vav is for room 1003 and 1 VAV is located in Prep side room M1001. Fa Status: Closed | Metropolitan Mechanical Contractors | $40K |
#BLDG1169663 Plumbing · ComMin Floor 10 Upgraded Locker Room Status: Closed | Metropolitan Mechanical Contractors | — |
#BLDG1155892 Commercial · Remodel Updating locker room in Special Pathogens Unit and replacing casework in patient rooms. certificate of occupancy required no const type: 1a occupancy: I2 2020 MSBC sprinklered: yes architect: anderson #49978 EAPC Status: Closed | Mortenson Construction | $576K |
#BLDG1151767 Mechanical · ComMFDNR Install ventilation to new hazardous material room, move existing L.P. steam and hot water piping to accommodate room construction. Safety shutoff controls are included with mechanical work. Status: Closed | Metropolitan Mechanical Contractors | $12K |
#BLDG1154148 Mechanical · ComMFDNR GRDs and ductwork alteration per approved plan. Status: Closed | Metropolitan Mechanical Contractors | $10K |
#BLDG1154256 Plumbing · ComMin Demo of existing sanitary piping in supply storage room. Demo cold domestic piping from hall wat into treatment room per page M003. Furnish and install (2) P-3A ELKAY ELUHAD161655, 18 gauge, type 304 stainless steel, 18-1/2" x18-1/ Status: Closed | Metropolitan Mechanical Contractors | — |
#BLDG1152209 Commercial · Addition Adding a hazardous waste storage room into the footprint of the loading dock buildout that is permitted under permit BLDG1084452. Added SF to the project is 0 SF. Status: Closed | M . A . Mortenson | — |
#BLDG1146836 Commercial · Remodel Remodeling storage, treatment, and staff spaces in the Pediatric therapy unit - 1st floor. certificate of occupancy required no const type: 1a occupancy: I2 2020 MSBC sac: _0_charges met council letter dated _10/15/25_ a Status: Closed | Mortenson Construction | $326K |
#BLDG1131578 Commercial · Remodel south lobby alterations. certificate of occupancy required no const type: 1 occupancy: I2 2020 MSBC sprinklered: yes architect: johnson #53808 BWBR architects Status: Closed | Mortenson Construction | $225K |
#BLDG1120448 Plumbing · ComMaj State licensed facility - plan review by MN Dept. of Labor and Industry - no city plan review required DIALYSIS AREA/FLOORS - Replacement of 56 dialysis boxes on floors 3rd through 6th as well as replacement of an existing RO skid and new RO loop for t Status: Closed | Metropolitan Mechanical Contractors | — |
#BLDG1123397 Mechanical · ComMFDNR Install new vav to include 2 supply openings and 1 return opening in newly created vender closet. Return air duct from storage room is transferred back to a common return location through protected wall openings that must be protected equivalent to the r Status: Closed | Metropolitan Mechanical Contractors | $6.3K |
#BLDG1121878 Commercial · Remodel REMODEL ROOM - CHANGE USE OF 'LACTATION LOUNGE' TO 'STORAGE ROOM' 2020 MSBC architect: 49978 - Anderson, James Charles @ EAPC Status: Closed | Mortenson Construction | $58K |
#BLDG1118359 Mechanical · ComMFDNR BLDG1118359 Relocate ducts, diffusers, and small refrigeration skid on the 1st floor of the children's masonic building due to department new needs. Follow 2024 energy code. Status: Closed | Metropolitan Mechanical Contractors | $32.8K |
#BLDG1114630 Commercial · Remodel BUILDING WORK RELATED TO REPLACING EQUIPMENT 2020 MSBC architect: 49978 - Anderson, James Charles @ EAPC Status: Closed | Mortenson Construction | $2.7M |
#BLDG1107815 Commercial · Remodel REFRESH TWO BATHROOMS AT 8TH FLOOR 2020 MSBC architect: 49978 - Anderson, James Charles (EAPC) Status: Closed | Mortenson Construction | $251K |
#BLDG1104608 Mechanical · ComMFDNR Adding new GRDs and all associated ductwork per approved plans. Status: Closed | Metropolitan Mechanical Contractors | $6.8K |
#BLDG1104607 Mechanical · ComMFDNR Minor duct alterations. BLDG1104607 Status: Closed | Metropolitan Mechanical Contractors | $4.5K |
#BLDG1104610 Plumbing · FoodBev barista station 9 replace sink Status: Closed | Metropolitan Mechanical Contractors | — |
#BLDG1102119 Commercial · Remodel remodel existing 2nd floor Family Resource Center in the East Building. approx 1700 sq ft. certificate of occupancy required no const type: 1a occupancy: I2 2020 MSBC sprinklered: yes architect: AECOM Status: Closed | Mortenson Construction | $356K |
#BLDG1094876 Commercial · Remodel REMODEL PEDIATRIC THERAPY UNIT IN EAST BLDG, FIRST FLOOR. NO STRUCTURAL WORK. (JJL) certificate of occupancy required no special inspections required no const type: IA occupancy: I-2, B, S-2 2020 MSBC occupant load: NO Status: Closed | Mortenson Construction | $112K |
#BLDG1089609 Mechanical · ComMFDNR Snowmelt design and conditions summary submittals are located in the document folder for reference. BLDG1089609 Status: Closed | Metropolitan Mechanical Contractors Inc | $701K |