Commercial General Building, Hvac/Mechanical, Plumbing work permitted December 5, 2024, with 21 permits through September 23, 2026, declaring $238,137,278 of work. Contractor on record: Gardner Builders.
Expansion of data center space to 3rd and 4th Floors and roof top mechanical upgrades. certificate of occupancy required: yes special inspections required: yes const type: 1a occupancy: b 2020 MSBC sprinklered: yes sac: _
Minneapolis permit records name Gardner Builders, Horwitz LLC and Metropolitan Mechanical Contractors as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
21 permits issued Dec 5 – Sep 23, newest first.
| Issued | Permit | Contractor | Value |
|---|
In Minneapolis, biggest first.
#BLDG1199307 Mechanical · ComMFDRR Replace (2) existing boilers with (2) new boilers Status: Issued | Metropolitan Mechanical Contractors | $559K | |
#BLDG1181293 Commercial · Remodel Expansion of data center space to 3rd and 4th Floors and roof top mechanical upgrades. certificate of occupancy required: yes special inspections required: yes const type: 1a occupancy: b 2020 MSBC sprinklered: yes sac: _ Status: Issued | Gardner Builders | $130M | |
#BLDG1198877 Plumbing · ComMin This work will include the rerouting of the existing level 3/4 plumbing services for architectural purpose. Piping to reconnect to their existing inlet and outlet. Status: Issued | Horwitz LLC | — | |
#BLDG1176900 Mechanical · ComMFDNR Demolition of hydronic and ventilation systems within two rooms on the 4th floor and the entirety of the 3rd floor per approved plans. Status: Issued | Horwitz LLC | $158K | |
#BLDG1173489 Commercial · Remodel (DMH-Pdox) INTERIOR DEMO ONLY TO 3RD & 4TH FLOORS. - 2020 MNSBC Architect: BRIAN BAILEY, #63902 (Palanisami Assoc) APPROVED PLANS AND PERMIT MUST BE ON SITE BEFORE INSPECTIONS WILL BE PROVIDED. APPLICANT IS REQUIRED TO PRINT COPIES OF ELECT Status: Closed | Gardner Builders | $900K | |
#BLDG1166442 Commercial · Remodel electrical room expansion for switching equipment upgrades - 1st floor. certificate of occupancy required: no const type: 1a 2020 MSBC sprinklered: yes architect: Gensler Architects Status: Closed | Gardner Builders | $120K | |
#BLDG1132815 Mechanical · ComMFDNR Installation of FO piping for existing generators. 10 generators are located on the 6th floor, and 8 generators are on the roof. New piping is connecting to existing pipe system on garage level and will connect to all existing generators. Review comments Status: Closed | Metropolitan Mechanical Contractors | $600K | |
#BLDG1135119 Mechanical · ComMFDNR HVAC system for data center on 4th and 5th floors, installing coolant distribution units, chilled doors, data center air handling units, buffer tanks, expansion tanks and all associated piping. Status: Closed | Metropolitan Mechanical Contractors | $6.9M | |
#BLDG1115080 Mechanical · ComMFDNR HVAC system installation on the 5th and 6th floor, installing chillers, heat exchanger, hydronic pumps, cooling tower, air separator and chilled/condenser water piping, per approved plan. Status: Closed | Horwitz LLC | $11.3M | |
#BLDG1125515 Commercial · Remodel minor alterations due to mechanical/electrical/plumbing upgrades. 5th floor heat exchange 2. Status: Closed | Gardner Builders | $500 | |
#BLDG1125507 Commercial · Remodel minor alterations due to mechanical/electrical/plumbing upgrades. 5th floor service order 1. Status: Closed | Gardner Builders | $500 | |
#BLDG1125516 Commercial · Remodel minor alterations related to generator room upgrades. Status: Closed | Gardner Builders | $500 | |
#BLDG1116853 Commercial · Remodel updated drawings related to BLDG1107881 engineer: palanasami Status: Closed | Gardner Builders | — | |
#BLDG1119786 Commercial · Remodel additional updates to drawing set for BLDG1107881 Status: Closed | Gardner Builders | — | |
#BLDG1111836 Commercial · Remodel additional work in conjunction with BLDG1107881. Status: Closed | Gardner Builders | $746K | |
#BLDG1107881 Commercial · Remodel 5th, 6th, and roof top alterations for significant mechanical upgrades. SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING/AIR CONDITIONING/VENTILATION WORK. occupancy: B 2020 MSBC sprinklered: yes architect: Jeffrey Wal Status: Closed | Gardner Builders | $1M | |
#BLDG1103871 Commercial · Remodel West cooling tower plant and battery room upgrades certificate of occupancy required: no special inspections required: no SEPARATE PERMITS ARE REQUIRED FOR ELECTRICAL, PLUMBING, HEATING/AIR CONDITIONING/VENTILATION WORK. occupancy: B Status: Closed | Gardner Builders | $50.4M | |
#BLDG1104077 Mechanical · ComMFDNR Chiller work. Most, but not all work will be in the existing chiller rooms. BLDG1104077 Status: Closed | Horwitz LLC | $1.4M | |
#BLDG1104544 Commercial · Remodel new PDU distribution - Levels 4, 5, & 6 new floors (See bldg1087202 for work previously done) (JJL) certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B & S-2 2020 MSBC sprin Status: Closed | Gardner Builders | $17.3M | |
#BLDG1095244 Commercial · Remodel COOLING TOWERS. (JJL) CORE 42 DATA CENTER UPGRADE. ENGINEER: P. PALANISAMI #11381 SPECIAL INSPECTIONS: YES - AET Status: Closed | Gardner Builders | $750K | |
#BLDG1087202 Commercial · Remodel Tenant Improvement - Levels 4, 5, & 6 certificate of occupancy required: no special inspections required: no const type: 1A occupancy: B & S-2 2020 MSBC sprinklered: yes 20% accessibility upgrades: Ambulatory Toilet Stal Status: Closed | Gardner Builders | $16M |