Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Cambridge, MA
Multifamily General Building work permitted July 25, 2025, with 2 permits through June 17, 2026, declaring $170,386 of work. Contractor on record: Celio M. Alves.
Make various repairs to Fresh Pond Place Phase 1 walkway area behind path to include-Replacement of set of exterior stairs-Replace wooden walkway by indoor pool entrance-Replace handrails along walkway and stairs-Coating of a single unit's concrete patio area with Sika 1 Shot traffic coating- Repair of concrete sidewalk by indoor pool entrance-Repair/coating of steel structure of footbridge near indoor pool entrance- Installation of new trim around garage doors
Cambridge permit records name Celio M. Alves and Mukhooy Industries as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
2 permits issued Jul 25 – Jun 17, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jun 15 | #1216020 |
Commercial and multifamily, biggest first.
Building: Alteration and Addition
Remove and repair ~37 SQ FT of crumbling concrete at garage entrance. Install #5 rebar dowels at approximately 16” on center to tie new concrete slab into existing slab. Install 6”x6” 10-gauge wire mesh reinforcement within new slab section.
Status: Complete
| Celio M. Alves |
| $4.7K |
| applied Jun 30 | #1172082 Building: Alteration and Addition Make various repairs to Fresh Pond Place Phase 1 walkway area behind path to include-Replacement of set of exterior stairs-Replace wooden walkway by indoor pool entrance-Replace handrails along walkway and stairs-Coating of a single unit's concrete patio area with Sika 1 Shot traffic coating-… Status: Active | Mukhooy Industries | $166K |