Multifamily General Building, Electrical, Plumbing work permitted January 2, 2025, with 4 permits through February 18, 2026, declaring $26,000 of work. Contractor on record: Master Electrician Frank A Horvath.
( Floors of structure are sagging. ) Selective tear out only no structural changes. Remove existing drywall from the ceiling and walls of vacant apartment units (shown on attached PDF) in order to expose the existing support structure. Once the drywall is removed a structural engineer will be brought in to provide a repair plan for future work to be done on a separate permit. ***DIGEPLAN*** *** CONTRACTOR TO BE BID *** *** ATTACHED ASBESTOS SURVEY *** *** ALL SUSPECT AND IDENTIFIED ACM OF BUILDING SHALL NOT BE DISTURBED ***
Buffalo permit records name Master Electrician Frank A Horvath, Daniel G Sprague and Richard Ries as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
4 permits issued Jan 2 – Feb 18, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|
#PLUM26-9676446 PLUMBING · PLUMBERS MASTER Install new backflow device at new meter and run DCW branch to 4 geothermally controlled DHW tanks and Hydronic heating equipment. Provide fill valve(s) and recirculation pump. | Daniel G Sprague | $6K | |
#ELEC26-9674764 ELECTRICAL Provide electrical installation for the Geothermal and Clean Heat Phase 2 project, encompassing the wiring of four heat pump disconnects, two water-to-water heat pumps, and a high-efficiency hot water tank. The scope includes powering the system flow center and two buffer tanks, ensuring all… | Master Electrician Frank A Horvath | $3K | |
#ELEC26-9674763 ELECTRICAL Rebuild the electrical service that was vandalized. 200A single phase temp service. GC and Master electrician (Frank Horvath) 716-548-0609 | Master Electrician Frank A Horvath | $2K | |
#TEAR24-9627227 TEAROUT ( Floors of structure are sagging. ) Selective tear out only no structural changes. Remove existing drywall from the ceiling and walls of vacant apartment units (shown on attached PDF) in order to expose the existing support structure. Once the drywall is removed a structural engineer will be… | Richard Ries | $15K |