New York City commercial construction projects
62,113 commercial and multifamily projects from New York City’s building permit records (11,363 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 8, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 792 of 1243
- 12 East 49 Street ManhattanConstruction work on the 31st floor (NW suite) as indicated on drawings.commercialBuilding· Tri-Star Construction Cor$370KJul 8
- 432 Park Avenue ManhattanTHE WORK INCLUDED IN THIS APPLICATION PERTAINS TO MINOR MODIFICATIONS TO THE 6TH FLOOR (CONST. FLR) 12TH FLOOR (MARKETING FLR) INTERIOR FIT OUT. THERE IS NO CHANGE TO USE…multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· Vanguard Construction And$429KAug 1
- 350 Fifth Avenue ManhattanMechanical modifications taking place on the 71st Floor as per plans filed herewith. No change in Use, Egress or Occupancy.commercialHVAC / Mechanical· Wolf Construction Corp 20$30KJul 8
- 15 Leonard Street ManhattanMinor interior renovation in existing apartment #3. Work to include interior demolition and general construction, as per plans filed herewith. No change in use, egress, or…multifamilyBuilding, Plumbing· Hydrokinetic PLBG & HTG I$69KJul 8
- 44 West 62 Street ManhattanInterior renovation work in the Apt.9D as shown on the plans such as replace all plumbing fixtures, rerrange the non load bearing walls and cosmetic work of painting. No changes…multifamilyBuilding, Plumbing· Atrium Constructions LLC$140KJul 16
- 1285 Avenue Of The Americas ManhattanModification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.commercialHVAC / Mechanical· Structure Tone, LLC$1.4MJul 8
- 157 Broome Street ManhattanEXTERIOR FACADE REPAIR WORK INCLUDING BRICK REPOINTING, INSTALLATION OF NEW STUCCO, AND REPLACEMENT OF WINDOW SILL AND LINTELS AS REQUIRED AT THE SOUTH AND EAST FACADES ONLY. NO…multifamilyBuilding· DKR Construction Co Corp$65KJul 8
- 1285 Avenue Of The Americas ManhattanModification to existing Sprinkler system and Plumbing modifications as per plans filed herewith.commercialFire protection, Plumbing· Preferred Mechanical Inc$255KJul 10
- 1285 Avenue Of The Americas ManhattanModification to existing HVAC system as per plans filed herewith. No change in use, egress or occupancy under this application.commercialHVAC / Mechanical· Structure Tone, LLC$450KJul 8
- 111 East 22 Street ManhattanCONVERT 1ST FLOOR AND MEZ TO DAY CARE CENTER FOR INFANTS/TODDLERS. MINOR GENERAL CONSTRUCTION WORK: PATCH WALLS AND CEILINGS, AS PER PLANS. PLUMBING, SPEINKLER, AND MECHANICAL…commercialBuilding· G.R.&J Hub Home Improve$300KJul 8
- 101 Park Avenue ManhattanRelocate existing diffusers. No change in use, egress or occupancy.commercialHVAC / Mechanical· Clune Construction Co LP$38.5KJul 8
- 116 Hudson Street Manhattaninterior renovation in the apt 4.multifamilyBuilding· Michilli Inc$434KJul 8
- 30 Hudson Yards ManhattanDemo of existing Structural Systems on 44-46 construction fls (64-66 marketing floors) and framing 40, 44-47 construction floors (60, 64-67 marketing) and inclusion of stair as…commercialBuilding· Structure Tone, LLC$134KJul 8
- 485 Lexington Avenue ManhattanInstallation of new plumbing fixtures and associated piping on the 1st floor (Just Salad) as per plans. No change to use, egress or occupancy.commercialPlumbing· RRP Plumbing Corp$73KJul 8
- 599 Lexington Avenue ManhattanPARTIAL WATERPROOFING REPLACEMENT AT PLAZA, INCLUDING INSTALLATION OFNEW WATERPROOFING SYSTEM, REMOVAL AND REINSTALLATION OF EXISTINGTRENCH DRAIN AND GRANITE PAVERS. NO CHANGE IN…commercialBuilding· Malatesta Paladino, Inc$700KJul 8
- 1345 6 Avenue ManhattanMechanical modifications to take place on the 15th & 16th floor as per drawings filed herewith. no change in use, egress, or occupancy.commercialHVAC / Mechanical· Structure Tone, LLC$90KJul 8
- 501 East 87 Street ManhattanApartment refurbishment for apartment 11A and 12ImultifamilyBuilding, Plumbing· JW Development Holdings L$94KSep 12
- 310 West 99 Street ManhattanINTERIOR RENOVATION OF APT. 207 ON THE 2ND FLOOR. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.multifamilyBuilding, Plumbing· Plumbing Works Corp$148KAug 1
- 210 West 70 Street ManhattanINSTALL NEW PARTITION WALL FOR EXISTING RESTAURANT SPACE AS PER PLAN FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding· High Quality Construction$663KDec 19
- 1000 5 Avenue ManhattanFire alarm panel closets for future additions to existing fire alarm system. No change in use, egress or occupancy.commercialBuilding· Island Acoustics LLC$150KJul 8
- 549 Audubon Avenue ManhattanPartial Removal of Existing BoilerscommercialHVAC / Mechanical· Central Mechanical System$610KJul 8
- 809 Broadway ManhattanINTERIOR RENOVATION TO PROPOSED RESTAURANT WITH NEW PARTITION, DOOR, FLOOR, CEILING AND PAINTING WORK ON FIRST FLOOR. INSTALL (2) WALK-IN COOLERS IN EXISTING STORAGE AREA IN…commercialBuilding· Millstone Construc LLC$220KJul 8
- 200 West 20 Street ManhattanMINOR INTERIOR RENOVATION OF APT 310 INCLUDING NEW PARTITIONS, CABINETS AND FINISHES. NO CHANGE TO EGRESS, OCCUPANCY OR FLOOR AREAmultifamilyBuilding· Equatorial Renovations Co$50KJul 8
- 41 River Terrace ManhattanINSTALLATION OF NEW GENERATOR, ASSOCIATED EQUIPMENT, CONCRETE PAD, AND BREECHING FOR NEW GENERATOR TO CONNECT TO EXISTING CHIMNEY LINER. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilyHVAC / Mechanical, Plumbing· Axis Mechanical Of NY Inc$790KSep 29
- 350 Fifth Avenue ManhattanMECHANICAL WORK ON THE 54TH FLOOR AS PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialHVAC / Mechanical· JRM Construction MGMT LLC$944KJul 8
- 39 Fifth Avenue ManhattanPlumbing work filed in conjunction with the renovation and combination of two existing dwelling units. Architectural, mechanical and structural work filed under separate…multifamilyPlumbing· Ark-Pol Plumbing Corp$50KJul 8
- 204 2 Avenue ManhattanFACADE RESTORATION INCLUDING LINTEL AND FACE BRICK REPLACEMENT, STONE REPOINTING AND SEALANT REPLACEMENT AS PER PLANS SUBMITTED. NO CHANGE IN USE,OCCUPANCY OR EGRESS.commercialBuilding· H.M. Hughes Co. Inc$512KJul 8
- 530 East 86 Street ManhattanREMOVE AND REPLACE EXISTING PH ROOF MEMBRANE AND FLASHINGS. INSTALL NEW STEEL GUARDRAILS AT PH ROOF LEVEL. REPLACE EXISTING BRICK MASONRY AT EXISTING BOILER CHIMNEY. NO CHANGE IN…multifamilyBuilding· Nova Construction Service$736KJul 8
- 14 East 75 Street ManhattanINTERIOR MECHANICAL WORK IN APARTMENT 4D. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilyHVAC / Mechanical, Plumbing· Royal HVAC Systems Inc$75KJul 8
- 19 West 44 Street ManhattanFILING HEREWITH DRAWINGS INDICATING FACADE REPAIRS FOR LOCAL LAW 11. NO CHANGE IN USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.commercialBuilding· Rally Restoration Corp$350KJul 8
- 52 William Street ManhattanALT-CO FILED FOR INTERIOR RENOVATION OF CELLAR AND FIRST FLOOR. CONVERT EXISTING DINING AREA AT FIRST FLOOR AS ACCESSORY FOR HOTEL GUESTS ONLY.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· CBB Plumbing Corp$450KNov 25
- 33 Greene Street ManhattanSTRUCTURAL UPDATES TO ACNE STUDIOS RETAIL STORE PER PLANS FILED HEREWITH. NO UPDATES TO EGRESS, OCCUPANCY OR USE.multifamilyBuilding· Michilli Inc$30KJul 8
- 242 West 14 Street ManhattanGeneral Construction to renovate existing apartment at the 3rd floor indicated on drawings filed herewith. No change in Use Egress or Occupancy under this application.multifamilyBuilding· G D Builders & Design Inc$90KJul 8
- 103 East 86 Street ManhattanINTERIOR RENOVATION TO EXISTING APARTMENT 1C ON THE 1ST FLOOR. REMOVE AND CONSTRUCT PARTITIONS AND FINISHES. ALL ASS PER PLAN FILED HEREWITH. NO CHANGE TO USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Bohemia J&P LLC$100KJul 8
- 35 Park Avenue ManhattanFACADE REPAIRS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Canido Basonas Const SVC$252KJul 8
- 3857 9 Avenue ManhattanFiling for partial building removal (Demo to be filed separately). Amend CO to remove uses. New South wall as per plans filed herewith.commercialBuilding· Dinaco Contracting Corp$145KJul 8
- 545 West 45 Street ManhattanGENERAL CONSTRUCTION TO RENOVATE THE 7TH FLOOR COMMERCIAL SPACE. WORK WILL INCLUDE DEMO OF NON-LOAD BEARING PARTITIONS, NEW FLOORING, AND NEW PARTITIONS & FINISHES. NO CHANGE IN…commercialBuilding· Speechless Enterprises In$315KJul 8
- 291 Central Park West ManhattanLimited renovation of class A residential apartment at 5th Fl (unit 5E) as per plans filed herewith. No change to use, egress, or occupancy under this application.multifamilyBuilding, HVAC / Mechanical, Plumbing· Smart PLBG & HTG Corp$225KJul 8
- 153 Mercer Street ManhattanRoof removal, new skylight install with aluminum frame, HSS beam, curb wall reinforcement, mech louver at bulkhead. Minor structural work. No change in use, egress, or occupancy…multifamilyBuilding· Michilli Inc$46KJul 8
- 1107 Fifth Avenue ManhattanSTRUCTURAL WORK IN CONJUNCTION WITH THE INTERIOR RENOVATION OF APARTMENT 11SE ON THE 011 FLOOR. LINTEL REPLACEMENT FOR WINDOW ENLARGEMENT. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.multifamilyBuilding· Ohagan Constrcution Inc$25KJul 8
- 435 East 57 Street ManhattanMech. work at exist. Cellar Laundry Rm. and Roof for removal/replacement of exist. gas dryer vents, new exhaust duct to Roof, and new exhaust fan at Roof as indicated on plans,…multifamilyHVAC / Mechanical· C C Controlled Combustion$30KJul 8
- 60 West 55 Street ManhattanINSTALLATION AND USE OF TEMPORARY SUSPENDED SCAFFOLD FOR FACADE REPAIRS AND INSPECTION AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.commercialBuilding· Avarga Construction Corp—Jul 8
- 1 Penn Plaza ManhattanMechanical work on the 25th floor (restrooms) as indicated on drawingscommercialHVAC / Mechanical· Mass Contracting Corp$43.5KJul 8
- 1250 1 Avenue ManhattanHouse pump and domestic/fire reserve tank replacement. Modifications to floor drains as shown on drawings. No change in use, egress or occupancy.commercialPlumbing· Alliance Plumbing Corp$650KJul 8
- 29 East 63 Street ManhattanMODIFICATION TO EXISTING SPRINKLER SYSTEM IN CONJUNCTION WITH ALT/CO# M00535056multifamilyFire protection· Crossfield PLBG.&HTG.Corp$76KJul 8
- 429 Dumont Avenue BrooklynRoofing Replacement and Roof Structure RenovationmultifamilyBuilding· J & N Construction Group$2.9MJul 8
- 463 60 Street BrooklynRENOVATION OF EXISTING CELLAR, FIRST, SECOND AND THIRD FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW WASHER, DRYER, BOILERS AND HOT WATER HEATERS IN…multifamilyPlumbing· Catman Plumbing Inc$60KJul 8
- 251 Douglass Street BrooklynSuspended Scaffold Installation for Facade Restoration and Inspectionmultifamily· Big Apple Renovation & Re—Jul 8
- 698 Ralph Avenue BrooklynSuspended Scaffold for Facade RepairmultifamilyBuilding· LS General Corp—Jul 8
- 141 23 Street BrooklynRENOVATION OF EXISTING APARTMENT #2L, #3L AND #3R WITH PLUMBING WORK:REPLACE KITCHEN AND BATHROOM FIXTURES; NEW WASHER AND ELEC. DRYER IN EACH APARTMENTS; NO CHANGE IN USE,…multifamilyPlumbing· John Fitzgerald PLBG &HTG$40KJul 8