New York City commercial construction projects
62,113 commercial and multifamily projects from New York City’s building permit records (11,363 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 8, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 791 of 1243
- 21-27 Himrod Street QueensConvert existing 6 half-size Classrooms into 3 full-size Classrooms. Remove and install new non-load bearing partitions, flooring, ceiling, and finishes. No change in use, egress…commercialBuilding, HVAC / Mechanical, Plumbing· A.T.J. Electrical Co Inc$315KAug 14
- 16-10 23 Street QueensInstallation of new rooftop air source heat pumps and modification to existing HVAC systems as per plans filed herewith. No change in use, egress or occupancycommercialHVAC / Mechanical· On-Trac Construction Asso$1.7MJul 8
- 16-10 23 Street QueensREMOVAL AND INSTALLATION OF PORTIONS OF INTERIOR BEARING WALLS & INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR…commercialBuilding· On-Trac Construction Asso$2.9MJul 8
- 163-07 72 Avenue QueensFILING STRUCTURAL WORK TYPE IN CONJUNCTION WITH NB APP# 421883359multifamilyBuilding· Great Stone Gen'l Const$1.5MJul 8
- 55 West 16 Street ManhattanOUTRIGGER SYSTEM INSTALLATION FOR INSPECTION & FACADE REPAIRS.NO CHANGE IN USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Xinos Construction Corp—Jul 8
- 149 Columbus Avenue ManhattanINTERIOR DEMOLITION AT 7-STORY BUILDING IN PREPARATION OF FULL DEMOLITION OF BUILDING, FILED UNDER APPLICATION#M01180442-I1commercialBuilding, HVAC / Mechanical· Breeze National Inc$200KJul 8
- 141 Columbus Avenue ManhattanINTERIOR DEMOLITION AT 10-STORY BUILDING IN PREPARATION OF FULL DEMOLITION OF BUILDING, FILED UNDER APPLICATION#M01179112-I1commercialBuilding, HVAC / Mechanical· Breeze National Inc$200KJul 8
- 14 Wall Street ManhattanInstallation of suspended scaffold for facade work or inspectioncommercial· Skyline Restoration Inc—Jul 8
- 538 West 120 Street ManhattanInstallation of material hoistcommercial· Archstone Restoration Cor—Jul 8
- 36 West 66 Street ManhattanFILING APPLICATION FOR THE INTERIOR RENOVATION OF APARTMENT 16D ON THE 13TH FLOOR. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilyBuilding· Total Home Improvement Se$153KJul 8
- 129 West 29 Street ManhattanRENOVATION OF OFFICE SPACES FROM FLOOR 003 TO FLOOR 005 WITH THE INSTALLATION OF NEW HVAC AND A/C UNITS FOR THE 3RD, 4TH, AND 5TH FLOOR OFFICE SPACES. NO CHANGE IN USE, EGRESS,…commercialBuilding, HVAC / Mechanical, Plumbing· American Standard P&H Cor$402KJan 15
- 113 South Street ManhattanINSTALLATION OF AIR CONDITIONING SPLIT SYSTEMS IN 2ND THROUGH 4TH FLOORS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.commercialHVAC / Mechanical· Total Builder Constructio$45KJul 8
- 1875 Lexington Avenue ManhattanMINOR RENOVATION OF UNIT #4C ON 4TH FLOOR, INCLUDING COSMETIC FINISH WORK. NO CHANGE TO USE, EGRESS OR OCCUPANCY.multifamilyBuilding· Redirecting Lic Inc$28KJul 8
- 510 West 121 Street ManhattanINSTALLATION OF THE SUSPENDED SCAFFOLDING INSTALLED IN ORDER TO PERFORM EXTERIOR REPAIRS. SIDEWALK SHED FILED UNDER SEPARATE APPLICATION. NO CHANGE IN USE OCCUPANCY OR EGRESS…commercialBuilding· C&C Daley's Const.Corp—Jul 8
- 112 South Street ManhattanINSTALLATION OF 12 AC UNITS AND 3 CONDENSERS AS PER DWGS. NO CHANGE OF USE, EGRESS OR OCCUPANCY.commercialHVAC / Mechanical· Total Builder Constructio$45KJul 8
- 830 Park Avenue ManhattanReconfigure existing main walk in closet, new ceiling molding, lighting and additional cabinet in gallery. No change of use, egress or occupancy under this application.multifamilyBuilding· M Construction NYC Corp$40KJul 8
- 417 East 81 Street ManhattanCD-5 for observation and work.multifamily· Traditional Water And Res—Jul 8
- 411 East 81 Street ManhattanCD-5 FOR FACADE INSPECTIONS AND WORK.multifamily· Traditional Water And Res—Jul 8
- 175 5 Avenue ManhattanFISP INSPECTION (Facade Inspection Safety Program). INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS. Designated Primary Site supervisor: Jesus Decolacommercial· Structual Presv System—Jul 8
- 862 9 Avenue ManhattanIRA FOR THE ALPHA BETA GAMMA LOCATION INSPECTIONmultifamily· PPM Telecom LLC—Jul 8
- 1411 Broadway ManhattanMECHANICAL FILING AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialHVAC / Mechanical· Theodore Williams Constr$388KJul 8
- 1411 Broadway ManhattanINSTALLATION OF NON LOAD BEARING PARTITIONS AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding· Theodore Williams Constr$660KJul 8
- 300 Cathedral Parkway ManhattanFISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Jul 8
- 15 West 72 Street ManhattanReplacement of electrical service fire rated walls and doors. No change in use, egress or occupancy.multifamilyBuilding· QHF Construction Inc$69KJul 8
- 301 Cathedral Parkway ManhattanFISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES AND METHODS. SEE ATTACHED PLANS Designated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Jul 8
- 245 Park Avenue ManhattanDemolition and general construction work in conjunction with tenant fit-outcommercialBuilding· Structure Tone, LLC$2.6MJul 8
- 321 East 22 Street ManhattanINSTALLATION OF SOLAR PANELS ON EXISTING ROOF STRUCTURE. NO CHANGE IN EGRESS,USE, OR OCCUPANCY.multifamilySolar· Sunkeeper Solar Electric$182KJul 8
- 35 East 10 Street ManhattanInstallation of suspended scaffold for facade work and/or inspection. Amend #1, change in rigger info from EQ-001 to EQ-023 title block and added scaffold anchor to wall detailmultifamily· Exo Industries Corp—Jul 8
- 20 East 9 Street ManhattanRETAIL VBOX-- INTERIOR DEMO AND CONSTRUCTION FOR PRE-TENANT SPACE AS PER PLANS FILED. NO CHANGE TO USE, EGRESS, OR OCCUPANCY.multifamilyBuilding, HVAC / Mechanical, Plumbing· Gravesend Construction Co$70.8KJul 15
- 560 3 Avenue ManhattanInterior renovation of existing commercial space (eating and drinking establishment). Partition, plumbing, mechanical and finish work as per plan. No change in use, occupancy or…multifamilyBuilding· Round M NYC Inc$80KJul 8
- 2 East End Avenue ManhattanFISP INSPECTION (Facade Inspection Safety Program) INDUSTRIAL ROPE ACCESS TECHNIQUES ANDMETHODS SEE ATTACHED PLANSDesignated Primary Site supervisor: Jesus Decolamultifamily· Structual Presv System—Jul 8
- 32 Old Slip ManhattanRemoval and installation of walls, doors, floor finishes and ceilings as per plancommercialBuilding· Coyle Contracting Corp$100KJul 8
- 340 East 64 Street ManhattanRENOVATE EXISTING APARTMENT 5R; WORK TO INCLUDE REMOVING AND INSTALLING NON-BEARING PARTITION WORK AND FINISHES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.multifamilyBuilding, Plumbing· Joly's Home Improvement I$144KJul 8
- 500 West 33 Street ManhattanRemoval of existing retail finishes, new retail wall finishes & ceiling adjustments along corridor & new retail demise for RU401 as shown on drawings. No change in use, egress or…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Swinerton Builders$250KDec 10
- 825 Third Avenue ManhattanMechanical work for office buildout on 32nd floor (33rd marketing floor)commercialHVAC / Mechanical· Icon Interiors Inc$56.9KJul 8
- 35 Washington Square West ManhattanInstallation of material hoistcommercial· Dna Contracting LLC—Jul 8
- 171 West 71 Street ManhattanGENERAL CONSTRUCTION INCLUDING MINOR PARTITION, CABINETRY AND FLOORINGREMOVAL. NEW PARTITIONS AND DOORS, NEW FINISHES, CABINETRY AND FLOORING AS PERPLANS SUPPLIED. NO CHANGE TO…multifamilyBuilding, Plumbing· Unlimited Renovation LLC$207KJul 14
- 920 Riverside Drive ManhattanINSTALLATION OF SUSPENDED SCAFFOLD FOR FACADE REPAIR APPLICATION # AND/OR INSPECTIONmultifamilyBuilding· Igh Restoration LLC—Jul 8
- 1900 Broadway ManhattanInstallation of demising partition. There is no change in occupancy, use, or egress.multifamilyBuilding· Structure Tone, LLC$170KJul 8
- 86 Bowery ManhattanPartial renovation of an existing commercial space. No change to occupancy, use, or eggresscommercialBuilding· WZ Consulting Corp$32.3KJul 8
- 100 William Street ManhattanREMOVAL AND INSTALLATION OF NON-LOADBEARING PARTITIONS AND ASSOCIATED FINISHES. NO CHANGE TO EGRESS, USE, OR OCCUPANCY.commercialBuilding· Precision Building & Cons$30KJul 8
- 580 Broadway ManhattanFILING FOR ARCHITECTURAL FIT OUT INSTALLATION OF INTERIOR NON-BEARING PARTITIONS AND RELATED FINISHES OF 4TH FLOOR AS PER PLANS OF FILED HEREWITH. NO CHANGE IN EGRESS, USE OR…commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· Addison PLBG And HTG Corp$861KSep 11
- 506 East 76 Street ManhattanRemoval and installation of interior non-load bearing partitions as per plans filed herewith. No change to use, egress or occupancy (CAFFATERIA RENOVATION)commercialBuilding, HVAC / Mechanical, Plumbing· Cook & Krupa LLC$477KJul 10
- 40 West 72 Street ManhattanInterior renovations consisting of partitions and finishes for dental office as per plans filed herewith. No change to use, egress or occupancy.multifamilyHVAC / Mechanical, Plumbing· Precision Worldwide$152KOct 16
- 485 Lexington Avenue ManhattanModifications to the existing HVAC system on the 7th and 8th floors as per plans. No change to use, egress or occupancy.commercialHVAC / Mechanical· Gilbane Building Company$1.5MJul 8
- 485 Lexington Avenue ManhattanMinor demolition with installation of new partitions, doors, suspended ceilings and finishes on the 7th and 8th floors as per plans. No change to use, egress or occupancy.commercialBuilding· Gilbane Building Company$820KJul 8
- 80 University Place Manhattanstructural work in conjunction with application.commercialBuilding· Jat Construction Group In$40KAug 8
- 345 East 80 Street ManhattanInterior renovation of existing apartment unit as per plan submitted herewith. No change in use, egress, or occupancy under this applicationmultifamilyBuilding, Plumbing· Interior Major Renovation$159KJul 10
- 535 Madison Avenue ManhattanProviding sanitary, vent, and domestic water piping layouts for pantry and wellness room. Added (2) sinks and an electric water heater with a domestic hot water circulation pump.…commercialFire protection, Plumbing· Dependable Mech Corp$78.5KJul 9
- 825 Fifth Avenue ManhattanRenovation of an existing apartment#2B on the second floor. Work include non-structural demolition and general construction as per plan file herewith. No change to use, egress or…multifamilyBuilding, Plumbing· Hanjo Contractors Inc$411KJul 8