New York City commercial construction projects
62,113 commercial and multifamily projects from New York City’s building permit records (11,363 of them permitted in the last 90 days), newest first, each with its address, scope, value and permits. The contractor is named once a project’s first permit is 30 days old (first permit on or before October 8, 2026); Pro shows it, with the phone number, the day the permit is issued.
Source: building permit records from New York City's Socrata open-data portal, checked daily. Data through . How we count
Page 789 of 1243
- 460 Third Avenue ManhattanErect non illuminated D/F Projecting non advertising sign on wall. No change of use, egress or occupancyimultifamilySigns· N.Y. Sign Art Inc—Jul 9
- 360 East 55 Street ManhattanInstallation of material hoistmultifamily· 3j's Restoration Inc—Jul 9
- 627 West 165 Street ManhattanSUSPENDED SCAFFOLDING FOR FACADE RESTORATION & MONORAIL SYSTEM FOR MATERIAL HOISTING AS SHOWN ON PLANScommercial· Western Waterproofing Co—Jul 9
- 50 West 34 Street ManhattanRemoval of mechanical piping and ductwork, as per plansmultifamilyBuilding, HVAC / Mechanical, Plumbing· State Contracting Corp NY$125KAug 22
- 260 12 Avenue ManhattanRemoval of existing (10) 550 Gal. and (2) 2,000 Gal. underground storage tanks. No change in use, egress or occupancy.commercial· Metro Environmental Srvcs$30KJul 9
- 180 Maiden Lane ManhattanINTERIOR RENOVATION IN COMMERCIAL OFFICE SPACE AS INDICATED ON PLANS. NO CHANGE IN USE, OCCUPANCY OR EGRESS.commercialBuilding· Nucor Construction Corp$70KJul 9
- 1900 Broadway ManhattanRemoval and installation of walls, floor finishes, and ceilings. There is no change to occupancy, use, or egress.multifamilyBuilding· CPM Builders Inc$4.2MJul 9
- 416 3 Avenue ManhattanTenant building out for a bagel shop as per the plans filed herewith. No change to the use, egress or occupancy.multifamilyBuilding, HVAC / Mechanical, Plumbing· Epoch Construction Inc$332KOct 24
- 2828 Broadway ManhattanFacade repairscommercialBuilding· Henry Restoration LTD$40KJul 9
- 825 Third Avenue ManhattanGeneral construction for office buildout on 32nd floor (33rd marketing floor)commercialBuilding· Icon Interiors Inc$89.9KJul 9
- 225 Liberty Street ManhattanGeneral Construction as shown on plans filed herewith. No change to use, egress or occupancy.commercialBuilding, Fire protection, HVAC / Mechanical, Plumbing· S.B.A. Plumbing Corp$9.3MJul 11
- 121 West 19 Street ManhattanInstallation of a suspended scaffold for Facade Inspection and repair as per plan submitted. No change to egress or occupancy.multifamilyBuilding· Prat Enterprises Corp—Jul 9
- 25 Central Park West ManhattanFiling for renovation of select room on the 19/20 floor in apartment unit. Interior demolition or non-load bearing partitions, general construction. No change of use, egress of…multifamilyBuilding· Moreland Construction GR$88KJul 9
- 208 East 21 Street ManhattanInterior renovation of public hallway. Filing to address HPD violations#17805120, 17844057 ORDER #491. All as per plans and applications. No change in use, egress or occupancy.multifamilyBuilding· Uncle Joe's General Contr$31.5KJul 9
- 12 East 49 Street ManhattanMechanical work on the 31st floor (NW suite) as indicated on drawings.commercialHVAC / Mechanical· Tri-Star Construction Cor$42KJul 9
- 34 Prince Street ManhattanGeneral construction proposed in triplex unit #2A on the cellar, 1st, and 2nd floors. Subsequent plumbing application to be filed. All per submitted plans. No changes to use,…multifamilyBuilding, Plumbing· A.M.N. Corporation$127KJul 15
- 300 Lafayette Street ManhattanRetail tenant improvements; interior renovation to partitions, ceilings and doors. No change in use, egress or occupancy.commercialBuilding, HVAC / Mechanical, Plumbing· JRM Construction MGMT LLC$3.9MJul 28
- 320 East 9 Street ManhattanFACADE REPAIRS AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilyBuilding· Jerrick Associates Inc$110KJul 9
- 254 East 10 Street ManhattanFACADE REPAIRS AS INDICATED ON THE PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS OR OCCUPANCYmultifamilyBuilding· Jerrick Associates Inc$150KJul 9
- 15 Broad Street ManhattanINTERIOR RENOVATION OF AN EXISTING APARTMENT INCLUDING NEW CABINETRY, FIXTURES, FLOOR AND WALL FINISHES, AND PARTITIONS AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR…multifamilyBuilding· Emm Contracting Group Co$120KJul 9
- 1157 Madison Avenue ManhattanDemolition of Hung Ceiling, Store Fixtures, Wall Finishes, Grind Floor Slab, Install Partitions, Doors, Sheetrock Ceiling, Millwork, Store Fixtures, Wall & Floor Finishes Within…multifamilyBuilding, HVAC / Mechanical, Plumbing· Tri-Star Construction Cor$80.3KJul 10
- 210 West 27 Street ManhattanAlumni Hall Exhaust (D & E): Modification of HVAC equipment and ductwork as indicated on plans filed herewith. no change to use, egress or occupancy.commercialHVAC / Mechanical· Maric Mechanical Inc$350KJul 9
- 501 East 87 Street ManhattanApartment refurbishment for apartment 19A and 14HmultifamilyBuilding, Plumbing· JW Development Holdings L$94KAug 27
- 45 Wall Street ManhattanINSTALLATION OF PLUMBING FIXTURES AS PER PLANS FILED. NO CHANGE TO USE, EGRESS OR OCCUPANCY.multifamilyPlumbing· Go Greener Plumbing LLC$90KJul 9
- 52 East End Avenue ManhattanPROPOSED INTERIOR RENOVATION WORK INCLUDING STRUCTURAL SLAB PENETRATION, NON-BEARING PARTITIONS FOR APT#39AB+PH2 AS SHOWN ON PLAN. NO CHANGE IN USE, EGRESS AND OCCUPANY.multifamilyBuilding· Lti Construction Corp$36KJul 15
- 71 West 47 Street ManhattanREPLACE ONE (1) AC SYSTEM WITH ONE (1) NEW HEAT-PUMP HVAC SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.commercialBuilding· Sound Refrigeration & Air$250KJul 14
- 311 Greenwich Street ManhattanCombination and renovation of two existing apartment #8A and 8B into one apartment on the 8th floor. Work to include non-structural demolition, general construction and…multifamilyBuilding, Plumbing· R.J.C. Mechanical Corp$177KJul 10
- 229 Chrystie Street Manhattan#8923 - Interior renovations of existing UG 6 space for Sugared + Bronzed. No change in egress, use, or occupancy.multifamilyBuilding· Darby Construction SVC LL$75KJul 9
- 1 Pier 57 ManhattanAddition of short runs of ductwork to serve phone rooms. No change to use, egress, or occupancy.commercialHVAC / Mechanical· Structure Tone, LLC$110KJul 9
- 2 Horatio Street ManhattanHEREBY FILING FOR RENOVATION OF DWELLING UNIT 5L. NEW KITCHEN CABINETRY/FINISHES/FIXTURES, NEW BUILT-IN MILLWORK, NEW BATHROOM FIXTURES AT EXISTING AREA. INSTALL NEW THRU-WALL AC…multifamilyBuilding, HVAC / Mechanical, Plumbing· Liquid 12 Interiors Inc$382KApr 23
- 66 Hudson Boulevard ManhattanHereby filing Alterations to an east wall of west 35th street lobby to provide a portal (glass wall & door) to a main lobby as shown on plans filed herewith. No change to use,…commercialBuilding· Turner Construction Compa$1.4MJul 9
- 961 Lexington Avenue ManhattanTHIS APPLICATION IS FILED FOR COSMETIC WORK TO THE EXISTING EATING AND DRINKING FACILITY AT THE 1ST FL, NEW KITCHEN EQUIPMENT, NEW ADA BATHROOM AT 1ST FL, NEW KITCHEN HOOD, NO…multifamilyBuilding· Lithos Constr Soluti Inc$436KJan 2
- 50 Hudson Yards ManhattanMECHANICAL MODIFICATIONS TAKING PLACE ON 18TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialHVAC / Mechanical· Structure Tone, LLC$155KJul 9
- 50 Hudson Yards ManhattanGENERAL CONSTRUCTION TAKING PLACE ON 18TH FLOOR AS PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.commercialBuilding· Structure Tone, LLC$210KJul 9
- 50 Park Avenue ManhattanPLUMBING MODIFICATIONS IN CONJUNCTION WITH INTERIOR ALTERATIONS TO APT 8FG.multifamilyPlumbing· Aqueduct Mechanical Corp$49.5KJul 9
- 252 West 85 Street ManhattanFacade repairs, including masonry restoration and replacement, with no changes to use, egress, or occupancy.multifamilyBuilding, HVAC / Mechanical· Avarga Construction Corp$158KJul 2
- 300 West 108 Street ManhattanRENOVATION OF 2 EXISTING BATHROOMS AND KITCHEN, RELOCATE LAUNDRY AND REMOVE OF ONE BATHROOM INCONJUNCTION WITH INTERIOR RENOVATION OF APARTMENT 2A. NO CHANGE IN USE OCCUPANCY OR…multifamilyPlumbing· DP Flynn PLBG & HTG Inc$30KJul 9
- 1399 Park Avenue ManhattanMiscellaneous Facade Restoration as per plans. No change in use, egress or occupancy.multifamilyBuilding· Structural Preserv System$400KJul 9
- 80 Elizabeth Street ManhattanCombining two residential apartments (Unit 3B & 3C) under TTPN 03/97 with interior renovation.multifamilyBuilding· Northbridge Contracting L$184KJul 9
- 1987 Amsterdam Avenue ManhattanAPPLICATION FILED FOR REPAIRING OF EXISTING RETAINING WALL INBACKYARD OF EXIST. 6-STORY APT BUILDING.multifamilyBuilding· Crystal Real Construction$40KJul 9
- 62 West 9 Street ManhattanExterior masonry wall repair at rear wall.multifamilyBuilding· MSN Construction Inc$80KJul 9
- 1290 Avenue Of The Americas ManhattanFILING ALT-1 TO INCLUDE NEW PLACE OF ASSEMBLY SPACE TO CURRENT CofO. THREE PAs TO BE FILED UNDER SEPARATEAPPLICATION NUMBERS: M01062866-I1 (13TH FLOOR MPR & TERRACES) ,…commercialBuilding· Structure Tone, LLC$1.4MJul 9
- 120 Riverside Boulevard ManhattanALT-2 FILING. PLAZA AND GARAGE REPAIRS. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.multifamilyBuilding· L & Z Restoration Corp$100KJul 9
- 345 East 57 Street ManhattanINSTALLATION OF SPLIT SYSTEM A/C UNITS (AIR HANDLER AND CONDENSING UNIT). NO CHANGE TO USE, EGRESS, OR OCCUPANCY.multifamilyHVAC / Mechanical· Fanuka Inc$65KJul 9
- 111 Murray Street ManhattanINTERIOR RENOVATION OF PENTHOUSE AS PER PLANS FILED HEREWITH. NO CHANGE TO USE, EGRESS NOR OCCUPANCY.multifamilyBuilding, Fire protection, HVAC / Mechanical, Plumbing· B.A.C.C Builders Inc$3.5MFeb 2
- 221 West 134 Street ManhattanFiling to convert SRO into 2 family dwelling. Work will consist of full interior renovation throughout with partitions, doors, finishes, as well as exterior repairs as needed-…multifamilyBuilding, Fire protection, Plumbing· US One Construction Inc$930KOct 30
- 52 Wilson Avenue BrooklynInstallation of suspended scaffold for facade work or inspectionmultifamily· Tower Services Inc—Jul 9
- 556 Hart Street BrooklynROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.multifamilySolar· Kamtech Restoration Corp$84.6KJul 9
- 2143 East 23 Street BrooklynROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.multifamilySolar· Kamtech Restoration Corp$81KJul 9
- 523 3 Street BrooklynINSTALL SOLAR PV ON EXISTING ROOFTOP. NO CHANGE IN USE, OCCUPANCY, OR EGRESS.multifamilySolar· Brooklyn Solarworks LLC$75.1KJul 9