Issued May 29 · 5 permits
$1.4M
*** AKA 320 Porter *** Interior Build Out of Saints Athletic Center. This space will function as an athletic center for students and staff. *** any plumbing, electrical or HVAC…
Get ProEvery project in every city · from $79/mo
Get ProMonthly permit report
By declared value.
Issued May 29 · 5 permits
$1.4M
*** AKA 320 Porter *** Interior Build Out of Saints Athletic Center. This space will function as an athletic center for students and staff. *** any plumbing, electrical or HVAC…
Issued May 7
$1.4M
Add Cold Aisle Containment System for (2) rows of 13 network equipment bays. Modify existing duct work to be directed into the containment system. Add new Building Automation…
Issued May 13 · 2 permits
Source: building permit records from official city open-data portals, checked daily. Data through . How we count
$564K
This project consists of, but is not limited to, the comprehensive repair and restoration of an existing multi-story parking garage as per plans submitted. The scope of the work…
Issued May 1 · 2 permits
$306K
Reconstruction of north softball diamond including backstop, re-grading of Gaelic football field, installation of bollards and boulders for pathway access control, replace…
Issued May 28
$250K
FACADE RENOVATIONS TO EXISTING 3-STORY COMMERCIAL BUILDING. *** DIGEPLAN *** *** MINOR SITE *** *** PRESERVATION *** *** ALL SEPARATE REQUIRED ELECTRICAL, MECHANICAL OR PLUMBING…
Issued May 28 · 3 permits
$211K
Installation of (9) outdoor condensors in existing space
Issued May 19
$200K
Interior fit out of existing commercial space for new restaurant. " Lou Lou's Restaurant " *** SEPARATE PERMITS REQUIRED FOR SIGNAGE, PLUMBING, ELECTRICAL AND HVAC PERMITS ***…
Issued May 22
$200K
Concrete repairs at various location throughout the garage along with waterproofing, expansion joint repair, and steel column repairs and painting. *** Digeplan ***
Issued May 9 · 3 permits
$132K
*** Change of Use *** Interior Build-out for Immersion Juicery. To establish Restaurant Take-Out use in a N-1D zone. *** all plumbing, electrical & HVAC work to be completed…
Issued May 29
$120K
Construct a 40' x 40', 20' high hoop structure with 8' high concrete T-wall foundation overtop a 50' x 50', 8" thick reinforced concrete slab. *** to be bid *** *** digeplan ***