Multifamily General Building work permitted March 18, 2025.
Historic District THE PROJECT IS FOR INSTALLING AN ADA ACCESS RAMP FROM THE COURTYARD WALKWAY TO THE WEST ENTRANCE OF STOCKTON HALL. EXCEPT FOR THE PROPOSED IMPROVEMENT AS SHOWN, NO EXTERIOR CONSTRUCTION OR REDEVELOPMENT IS PROOSED. PROPOSED WORK WILL BE AT GRADE-LEVEL AND NO CHANGES IN THE SURFACE GRADING ARE PROPOSED. THE PROJECT WILL NOT DISTURB ANY AREAS OF NATURAL COVER, WILL NOT RESULT IN AN INCREASE IN IMPERVIOUS AREA, AND AS SUCH NO NEW STORMWATER MANAGEMENT SYSTEMS ARE REQUIRED OR POSPOSED.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
1 permit issued Mar 18 – Mar 18, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#B2502271 CONSTRUCTION · ALTERATION AND REPAIR Historic District THE PROJECT IS FOR INSTALLING AN ADA ACCESS RAMP FROM THE COURTYARD WALKWAY TO THE WEST ENTRANCE OF STOCKTON HALL. EXCEPT FOR THE PROPOSED IMPROVEMENT AS SHOWN, NO EXTERIOR CONSTRUCTION OR REDEVELOPMENT IS PROOSED. PROPOSED WORK WILL BE AT GRADE-LEVEL AND NO CHANGES IN THE… Status: Permit Issued |
Commercial and multifamily, biggest first.
| Not published |
| — |