Get Promultifamily project · Washington DC, DC
Multifamily General Building, Electrical, Hvac/Mechanical, Plumbing work permitted February 24, 2025, with 11 permits through August 11, 2026.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
11 permits issued Feb 24 – Aug 11, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#E2611771 SUPPLEMENTAL · ELECTRICAL Electrical Trade Permit Status: Permit Issued | Not published | — | |
Commercial and multifamily, biggest first.
#B2606048 CONSTRUCTION · ALTERATION AND REPAIR RENOVATION OF THREE SEPARATE CLASSROOMS INTO A SINGLE CLASSROOM SPACE WITH UPGRADES TO MECHANICAL AND AV/IT SYSTEMS, LIGHTING, AND FINISHES THROUGHOUT. AREA AFFECTED 2736 SF Status: Permit Issued |
| Not published |
| — |
#E2607190 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#M2602321 SUPPLEMENTAL · MECHANICAL Status: Permit Issued | Not published | — |
#P2604401 SUPPLEMENTAL · PLUMBING AND GAS Status: Completed | Not published | — |
#AN2500123 CONSTRUCTION · MISCELLANEOUS - ANTENNA Re-permit of expired AN2300146: The project involves removing four (4) antennas, three (3) from the alpha sector and one (1) from the beta sector, removing four (4) remote radio heads (RRH), removing two (2) antenna mounts, two (2) each from the alpha and beta sector, installing two (2) antenna… Status: Permit Issued | Not published | — |
#P2511396 SUPPLEMENTAL · PLUMBING AND GAS Status: Completed | Not published | — |
#FB2500087 SUPPLEMENTAL · BOILER - FUEL BURNING Status: Permit Issued | Not published | — |
#E2513394 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#B2409540 CONSTRUCTION · ALTERATION AND REPAIR Interior alteration for heating water plant upgrades. Project to include new 2 hour rated enclosure around boiler flue. Status: Permit Issued | Not published | — |
#EX2500014 CONSTRUCTION · EXCAVATION ONLY THE PROJECT PROPOSES A TEMPORARY 9'X16'X14' DEEP EXCAVATION IN THE LOADING DOCK OF THE GEORGE WASHINGTON UNIVERSITY LISNER AUDITORIUM TO FACILITATE THE REPLACEMENT OF BELOW GRADE MECHANICAL EQUIPMENT WITHIN THE ADJACENT AUDITORIUM BUILDING TO THE EAST. EXISTING HARDSCAPE AND SOFTSCAPE SURFACES… Status: Permit Issued | Not published | — |