Multifamily General Building, Demolition work permitted June 13, 2025, with 7 permits through September 18, 2026.
MODERNIZATION AND INTERIOR RENOVATION OF EXISTING SCHOOL, INCLUDING DEMOLITION AND AN ADDITION WITH A NEW STRUCTURE, INTERIOR PARTITIONS AND MEP SYSTEM. SITEWORK INCLUDES RE-GRADING AND LANDSCAPE ELEMENTS, UTILITIES, GEOTHERMAL WELLS AND PARKING. PROPOSED GFA 160,970 SF
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
7 permits issued Jun 13 – Sep 18, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#B2605532 CONSTRUCTION · ADDITION ALTERATION REPAIR MODERNIZATION AND INTERIOR RENOVATION OF EXISTING SCHOOL, INCLUDING DEMOLITION AND AN ADDITION WITH A NEW STRUCTURE, INTERIOR PARTITIONS AND MEP SYSTEM. SITEWORK INCLUDES RE-GRADING AND LANDSCAPE ELEMENTS, UTILITIES, GEOTHERMAL WELLS AND PARKING. PROPOSED GFA 160,970 SF Status: Permit Issued |
Commercial and multifamily, biggest first.
| — |
#UT2600043 CONSTRUCTION · MISCELLANEOUS - UNDERGROUND STORAGE TANK Removal of one (1) 15,000-gallon underground storage tank (UST) Status: Permit Issued | Not published | — |
#SB2600127 CONSTRUCTION · MISCELLANEOUS - SOIL BORING Drilling 138 closed loop geothermal wells at 5800 feet each using mud rotary drilling for heating and cooling purposes. Status: Permit Issued | Not published | — |
#SB2600157 CONSTRUCTION · MISCELLANEOUS - SOIL BORING Advancement of seven (7) soil borings for environmental assessment Status: Permit Issued | Not published | — |
#D2600247 CONSTRUCTION · DEMOLITION Scope of work includes demolition of existing interior finishes, fixtures and systems in preparation for future renovation project (to be submitted under separate cover). Work also includes facade remediation and demolition of windows which will be replaced in the future renovation project. No… Status: Permit Issued | Not published | — |
#SB2500214 CONSTRUCTION · MISCELLANEOUS - SOIL BORING Temporary Geotechnical Soil Borings. Number of Borings: 10. Diameter of Boreholes: 8 inches. Depth of Borings: 50 ft. Drilling Method: 3.25 inch HSA. Abandonment Method: Tremie Grouting with Bentonite grout Status: Permit Issued | Not published | — |
#SB2500126 CONSTRUCTION · MISCELLANEOUS - SOIL BORING Drilling one closed loop geothermal well at 500 feet using mud rotary Status: Permit Issued | Not published | — |