Commercial General Building, Demolition work permitted March 20, 2026, with 2 permits through September 16, 2026.
The scope includes the demolition of approximately 300 square feet of existing sidewalk. Additionally, three existing light poles will be removed, including their concrete foundations. All activities will be contained within a temporary fenced work zone, with precautions rigorously enforced to ensure the safety and protection of pedestrians in the surrounding area.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
2 permits issued Mar 20 – Sep 16, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#D2600043 CONSTRUCTION · DEMOLITION The scope includes the demolition of approximately 300 square feet of existing sidewalk. Additionally, three existing light poles will be removed, including their concrete foundations. All activities will be contained within a temporary fenced work zone, with precautions rigorously enforced to… Status: Permit Issued |
Commercial and multifamily, biggest first.
| Not published |
| — |
#B2601368 CONSTRUCTION · ALTERATION AND REPAIR This project involves the construction and installation of a new steel canopy over the existing escalator entrance at the Tenleytown-AU Metro Station. The canopy base will be secured to the parapet wall surrounding the station. Key installation activities include temporary fencing, erecting a work… Status: Permit Issued | Not published | — |