Commercial General Building, Electrical, Hvac/Mechanical, Plumbing work permitted February 25, 2025, with 7 permits through July 30, 2025.
The work includes interior reconfiguration of the first and second floor of this building. New work in this permit includes mechanical, fire protection, plumbing & electrical work on the first and second floor only. Work includes reconfiguration of non-structural partitions only. No load bearing work is included. Work includes change in use from (M) Mercantile to (B) Office. No exterior work is included. No utility work or upgrades are included. Change of use to office.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
7 permits issued Feb 25 – Jul 30, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#M2504271 SUPPLEMENTAL · MECHANICAL |
Commercial and multifamily, biggest first.
Status: Completed
| Not published |
| — |
#M2504232 SUPPLEMENTAL · MECHANICAL Status: Permit Issued | Not published | — |
#B2506239 CONSTRUCTION · ALTERATION AND REPAIR Revision to existing building permit #B2404392 to add an additional toilet on the 2nd floor, adjust the mechanical design for a closed office layout, add 2 pantries, add a conference room, create a storage room on the lower level Status: Completed | Not published | — |
#P2507039 SUPPLEMENTAL · PLUMBING AND GAS Status: Completed | Not published | — |
#E2507180 SUPPLEMENTAL · ELECTRICAL Status: Completed | Not published | — |
#P2505724 SUPPLEMENTAL · PLUMBING AND GAS Status: Completed | Not published | — |
#B2404392 CONSTRUCTION · ALTERATION AND REPAIR The work includes interior reconfiguration of the first and second floor of this building. New work in this permit includes mechanical, fire protection, plumbing & electrical work on the first and second floor only. Work includes reconfiguration of non-structural partitions only. No load bearing… Status: Completed | Not published | — |