Commercial General Building work permitted September 16, 2025, with 6 permits through October 21, 2026.
Historic and CFA Proposed improvements include utility connections to the existing electrical infrastructure for new pad mounted switches (PMSW). Proposed site improvements include general repair of existing curb, concrete drainage channel, asphalt and concrete paving as needed for utility trenching. New concrete pads for the proposed electrical equipment.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
6 permits issued Sep 16 – Oct 21, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#BCIV2600173 CONSTRUCTION · CIVIL PLANS Historic and CFA Proposed improvements include utility connections to the existing electrical infrastructure for new pad mounted switches (PMSW). Proposed site improvements include general repair of existing curb, concrete drainage channel, asphalt and concrete paving as needed for utility… Status: Permit Issued | Not published | — |
Commercial and multifamily, biggest first.
#BCIV2600099 CONSTRUCTION · CIVIL PLANS This project redevelops the unused habitat space previously for the bison on the campus of Smithsonian Institution's National Zoo for a new animal habitat. Approximately 36,000 square feet of redevelopment includes rerouting of existing utilities, introduction of new utility piping, and the… Status: Permit Issued | Not published | — |
#BCIV2500118 CONSTRUCTION · CIVIL PLANS Commission of Fine Arts jurisdiction area ***FEDERAL National Zoological Park This project consists of the construction of bridge abutment scour and slope failure countermeasures. These countermeasures consist of riprap armoring and construction of a rock cross vane in the Rock Creek streambed. Status: Permit Issued | Not published | — |
#SB2600035 CONSTRUCTION · MISCELLANEOUS - SOIL BORING CFA / H The purpose of the project is to perform geotechnical investigations, specifically soil borings, to enable the design and construction of a proposed exhibit and enclosure for the Arabian Leopards based on a concept design. Status: Permit Issued | Not published | — |
#SB2500284 CONSTRUCTION · MISCELLANEOUS - SOIL BORING Commission of Fine Arts jurisdiction area The SI National Zoological Park lower bear habitat modernization project will renovate and improve the existing habitat and enclosure for the Andean Bears based on Option 1 of the 2020 Concept Design. The renovation will include removal and replacement of… Status: Permit Issued | Not published | — |
#SB2500271 CONSTRUCTION · MISCELLANEOUS - SOIL BORING CFA/H We understand that the National Zoo will replace the existing Hawthorne substation building in the National Zoological Park located at 3001 Connecticut Avenue in Washington, DC. To aid in the design of substation building, we will perform two (2) soil borings located at the north of existing… Status: Permit Issued | Not published | — |