Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Washington DC, DC
Multifamily General Building work permitted April 4, 2025.
Main Roof: Removal of the exiting multi-ply modified bitumen roofing system including the existing insulation and cover board to expose the existing concrete deck. Installation of a new reinforced Hot-Rubberized asphalt waterproofing System applied directly to the concrete deck with new PUMA flashing at perimeters, vertical transitions and penetrations, Insall new protection board, drainage board, and 4" of XPS insulation. (2-layers staggered). Salvage and reinstall existing pavers. Stair Penthouse Roof & Elevator Machine Roof: Removal of existing 2-ply Mod Bit system to expose concrete…
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
1 permit issued Apr 4 – Apr 4, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#B2502843 CONSTRUCTION · ALTERATION AND REPAIR Main Roof: Removal of the exiting multi-ply modified bitumen roofing system including the existing insulation and cover board to expose the existing concrete deck. Installation of a new reinforced Hot-Rubberized asphalt waterproofing System applied directly to the concrete deck with new PUMA… |
Commercial and multifamily, biggest first.
Status: Permit Issued
| Not published |
| — |