Multifamily General Building, Electrical, Elevator, Solar work permitted October 8, 2025, with 5 permits through August 3, 2026.
REPAIR AND REPLACE THE FOLLOWING IN THE EMR***Replace (2) elevator mainline disconnects, Replace (2) 110v cab light disconnects, Replace lights in EMR with LED, Replace lights in pits with LED, Replace all receptacles with GFI.
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
5 permits issued Oct 8 – Aug 3, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#E2611490 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
Commercial and multifamily, biggest first.
#SOL2601730 CONSTRUCTION · SOLAR SYSTEM Installation of 348 rooftop SEG Solar Inc. SEG-440-BTD-BG solar panels utilizing a pre-engineering rooftop racking system. Total DC System size: 153.12kW. Total AC System Size: 100kW. Status: Permit Issued | Not published | — |
#EA2600424 SHOP DRAWING · ELEVATOR - ALTERATION Elevator 1 and 2 modernization including new microprocessor based control systems, hoist machines & motors, rope grippers, hoist ropes w/wedge shackles, safeties, roller guides for car & countweight, hall & car fixtures, and cab interior finishes. Status: Permit Issued | Not published | — |
#E2601479 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#B2509310 CONSTRUCTION · ALTERATION AND REPAIR REPAIR AND REPLACE THE FOLLOWING IN THE EMR***Replace (2) elevator mainline disconnects, Replace (2) 110v cab light disconnects, Replace lights in EMR with LED, Replace lights in pits with LED, Replace all receptacles with GFI. Status: Permit Issued | Not published | — |