Multifamily General Building work permitted May 28, 2026.
In the Woodley Park Historic District Interior work only, repair/replace the following: replace switch disconnects for elevator mainline power, fireproof openings and voids in elevator room and hoistway, upgrade the electrical equipment in elevator equipment spaces and pit, upgrade the lighting in elevator equipment spaces and pit, upgrade ventilation in elevator equipment space, new or modified pit access ladder, new stand-alone elevator supervisory control (ESCU) FACP, provide to install an emergency battery backup light in elevator equipment space, provide new 3000 gph sump pump with a…
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
1 permit issued May 28 – May 28, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#B2603310 CONSTRUCTION · ALTERATION AND REPAIR In the Woodley Park Historic District Interior work only, repair/replace the following: replace switch disconnects for elevator mainline power, fireproof openings and voids in elevator room and hoistway, upgrade the electrical equipment in elevator equipment spaces and pit, upgrade the lighting in… |
Commercial and multifamily, biggest first.
Status: Permit Issued
| Not published |
| — |