Multifamily General Building, Electrical, Elevator, Hvac/Mechanical, Plumbing work permitted January 8, 2025, with 8 permits through August 6, 2025.
Modernizing Cars 1 - Replace: Frame, Controller, machine, motor, governor, rope gripper, freight door operation controls, car & counterweight guides, COPs, hall buttons, interior, floor Retain: entrances, platform, frame, safeties, buffers
Washington DC’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
8 permits issued Jan 8 – Aug 6, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#EA2502299 SHOP DRAWING · ELEVATOR - ALTERATION Modernizing Cars 1 - Replace: Frame, Controller, machine, motor, governor, rope gripper, freight door operation controls, car & counterweight guides, COPs, hall buttons, interior, floor Retain: entrances, platform, frame, safeties, buffers |
Commercial and multifamily, biggest first.
Status: Permit Issued
| Not published |
| — |
#E2509138 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |
#B2505718 CONSTRUCTION · ALTERATION AND REPAIR FOR ELEVATOR REVIEW ONLY***INTERIOR WORK ONLY***REPAIR & REPLACE THE BELOW ITEMS IN THE E.M.R***Replace the elevator mainline disconnect, Replace the 110v cab light disconnect, Replace lights and GFIs in EMR and Pit. Status: Permit Issued | Not published | — |
#P2505649 SUPPLEMENTAL · PLUMBING AND GAS Status: Permit Issued | Not published | — |
#E2506896 SUPPLEMENTAL · ELECTRICAL Electrical Trade Permit Status: Permit Issued | Not published | — |
#B2502917 CONSTRUCTION · ALTERATION AND REPAIR RENOVATION OF SUITES 202 AND 203 INTO ONE OFFICE SUITE WITH AN UPDATED FLOOR LAYOUT, HVAC CONFIGURATION AND FINISHES. Status: Permit Issued | Not published | — |
#M2501253 SUPPLEMENTAL · MECHANICAL Status: Permit Issued | Not published | — |
#E2503828 SUPPLEMENTAL · ELECTRICAL Status: Permit Issued | Not published | — |