Commercial General Building, Fire Protection, Hvac/Mechanical, Plumbing work permitted November 7, 2024, with 16 permits through October 22, 2026, declaring $10,870,478 of work.
Get new commercial permits near 98409 or Tacoma, free weekly email
PARTIAL ALTERATION OF AN EXISTING TWO-STORY MOTEL INTO 48 CONGREGATE HOUSING UNITS *Plumbing, Mechanical, and Fire scopes require separate permits** **FRC26-0230 (10.09.26): Interior renovations to change three existing hotel spaces, previously identified as "out of scope," into office, storage, and "Wellness" spaces.**
Tacoma’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
16 permits issued Nov 7 – Oct 22, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Sep 17 | #MECHC26-0213 Building · Mechanical Removal and decommissioning of three existing electric furnace/split HVAC systems serving the dining room, ballroom, and main entrance areas. **Replacement systems will be installed separately by another contractor under a separate permit.** |
Commercial and multifamily, biggest first.
Status: Permit Issued
| Not published |
| $7.5K |
| applied Jul 17 | #FIREC26-0141 Building · Fire Protection Upgrading fire alarm system to cover Phase 2 for Commercial Building. Status: Permit Issued | Not published | $43K |
| applied Jun 26 | #PLMBC26-0148 Building · Plumbing Plumbing Fixtures ( install-relocate -replace) at OASIS INN PHASE 2 Replace lavatories in all tenant units. Additionally, two (2) Type A units will receive new water closets and accessible showers, while eight (8) Type B units will receive new water closets and bathtubs. Revise (3) common… Status: Permit Issued | Not published | $187K |
| applied Oct 17 | #BLDCA25-0327 Building · Alteration PARTIAL ALTERATION OF AN EXISTING TWO-STORY MOTEL INTO 48 CONGREGATE HOUSING UNITS *Plumbing, Mechanical, and Fire scopes require separate permits** **FRC26-0230 (10.09.26): Interior renovations to change three existing hotel spaces, previously identified as "out of scope," into office, storage,… Status: Permit Issued | Not published | $5.1M |
| applied Jan 7 | #MECHC26-0002 Building · Mechanical Like for like replacement of existing fans, PTHPs, and split system heat pumps. Addition of split system heat pumps and duct modifications, every apartment is to be provided with like for like replacement of existing exhaust fan with fan EF-R, tied into existing ductwork. Status: Permit Issued | Not published | $49.1K |
| applied Sep 22 | #FIREC25-0230 Building · Fire Protection Modify the existing fire sprinkler system to accommodate the new architectural design, for phase 1. This will include upgrading the existing 13R system to a full 13 system, including adding a dry system in the attic and a fire pump. All work for phase 1 only. Phase 2 to be under a future permit. Status: Finaled | Not published | $175K |
| applied Aug 20 | #MECHC25-0220 Building · Mechanical Installation /Replacement of like-for-like air balance and commissioning per plans.HOTELS/MOTELS Status: Finaled | Not published | $160K |
| applied Aug 26 | #EFIRET25-0021 ePermit · Transmitter Install cellular dialer to monitor existing fire alarm system. Status: Permit Issued | Not published | $3.5K |
| applied Aug 4 | #FIREC25-0176 Building · Fire Protection Upgrading the fire alarm system Status: Finaled | Not published | $60K |
| applied Aug 6 | #STORM25-0035 Utility Connection New STORMWATER CONNECTION at HOTEL/MOTELS. All in Private property, NO work in the ROW, or patch is needed. Status: Permit Issued | Not published | $10K |
| applied Jul 10 | #SEWER25-0485 Utility Connection New installation of sanitary sewer line at commercial building. Open trench method. YES work in ROW, Patch included , 5 days Barricade per approved TCP. Status: Finaled | Not published | $15K |
| applied Feb 28 | #BLDCA25-0063 Building · Alteration PRIORITY - PARTIAL ALTERATION OF AN EXISTING TWO-STORY MOTEL INTO 53 APARTMENT UNITS AND 16 CONGREGATE HOUSING UNITS. ***FRC25-0036 APPROVED 12/23: Replacement of an existing egress staircase and associated handrails and guardrails.*** Status: Permit Issued | Not published | $4.7M |
| applied May 30 | #PLMBC25-0154 Building · Plumbing ****PLUMBING APPROVED UNDER BLDCA25-0063**** Add small kitchen sinks to most of the tenant units. Relocate and replace bathroom lavatories. Replace failing hot water recirculation piping. Minor upgrades and repairs. Existing hot and cold-water piping will remain. The existing waste is 6" and sized… Status: Finaled | Not published | $290K |
| applied Dec 18 | #BLDCA24-0479 Building · Alteration REMOVE (3) ANTENNAS, REMOVE (12) 7/8" COAX CABLES, REMOVE (E) CONCEALMENT CANISTER, INSTALL (2) SITE PRO 1 ANTENNA SECTOR MOUNTS, P/N: UTSM, INSTALL (3) COMMSCOPE FFVV-65A-R2-V1 ANTENNAS, INSTALL (3) NOKIA AEHC ANTENNAS, INSTALL (2) SITE PRO 1 RRU MOUNTS, P/N: 3WPP-UPC, INSTALL (3) NOKIA AEHC… Status: Final Inspection | Not published | $20K |
| applied Nov 30 | #BLDCA23-0441 Building · Alteration VERIZON WIRELESS PROPOSES TO INCREASE THE HEIGHT OF THE POLE TO 71'-6" AS PER DETAILS PROVIDED AND TO INSTALL AN UNMANNED TELECOMMUNICATIONS FACILITY CONSISTING OF THE INSTALLATION OF (9) NEW PANEL ANTENNAS WITHIN NEW ANTENNA SHROUD (DESIGNED BY OTHERS), (6) RADIOS, (6) DIPLEXERS, (1) HYBRID… Status: Final Inspection | Not published | $50K |
| applied Jul 2 | #SDEV24-0250 Site Site Development associated with minor modification to existing towner. Includes new cabinet install and concrete pad. Status: Finaled | Not published | $50K |