Get Procommercial project · Tacoma, WA
Commercial General Building, Hvac/Mechanical, Plumbing, Sign work permitted October 31, 2024, with 13 permits through November 5, 2025, declaring $4,898,377 of work.
Get new commercial permits near 98409 or Tacoma, free weekly email
New facade work to upgrade existing mall entries.
Tacoma’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
13 permits issued Oct 31 – Nov 5, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Oct 23 | #PLMBC25-0270 Building · Plumbing • Disconnect the existing West Restrooms plumbing fixtures. Cap the water to the space to allow demo by others. • Furnish and install new rough plumbing for the new restroom layout as shown in drawings. • Furnish and install new toilet carriers, new ProFlo PF1713WH wall hung toilets, new ProFlo… Status: Finaled |
Commercial and multifamily, biggest first.
| Not published |
| $80.8K |
| applied Sep 17 | #SIGN25-0107 Sign Install (2) WALL MOUNTED Fascia Single - Face, illuminated SIGN at Food Court of the Tacoma Mall. Status: Finaled | Not published | $3.2K |
| applied Sep 3 | #BLDCA25-0284 Building · Alteration New facade work to upgrade existing mall entries. Status: Final Inspection | Not published | $2.5M |
| applied Jul 10 | #SIGN25-0076 Sign Install (1) SF Illuminated Fascia Sign at Tacoma Mall Garage Status: Permit Issued | Not published | $5K |
| applied Aug 4 | #MECHC25-0200 Building · Mechanical Restaurant tenant improvement ***Mechanical Fixure - Reviewed and approved under BLDCN24-0037 at COMMERCIAL Demolition of existing ductwork as indicated on: M200 – HVAC Demo Floor Plan Provide and install new sheet metal air distribution system as shown on drawings. This includes volume dampers,… Status: Finaled | Not published | $50.8K |
| applied Aug 4 | #PLMBC25-0204 Building · Plumbing Plumbing associated with restaurant tenant improvement at Dave's Hot Chicken Status: Finaled | Not published | $59.3K |
| applied Feb 12 | #MECHC25-0052 Building · Mechanical Provide and install (3) RTU's, (6) VAV's, (1) Ductless Mini-Split and (1) Exhaust Fan. Ductwork modifications and new GRDs. Status: Finaled | Not published | $200K |
| applied Feb 27 | #SIGN25-0018 Sign Erect 2 single faced illuminated fascia signs for Pop Mart. ***FIELD REVISION APPROVED 05/06/25 ADDITION OF 1 SIGN.*** Status: Finaled | Not published | $5.3K |
| applied Feb 12 | #PLMBC25-0050 Building · Plumbing Demo (1) existing drinking fountain and provide with new and adjust existing mop sink orientation. Status: Finaled | Not published | $9K |
| applied Nov 5 | #MECHC24-0279 Building · Mechanical Installation of New RTU's, VAV's, Ductwork and diffusers at Apple Store - Tacoma Mall. Status: Finaled | Not published | $120K |
| applied Oct 18 | #BLDCA24-0411 Building · Alteration Alteration of existing tattoo/piercing shop into new tattoo/piercing shop - finish work and business name change Status: Finaled | Not published | $25K |
| applied Nov 5 | #PLMBC24-0230 Building · Plumbing Installation of expansion tank, hot water tank, recirc pump, floor drains, Water closet and wall clean-outs at the Tacoma Mall Apple Store. Status: Finaled | Not published | $40K |
| applied May 20 | #BLDCA24-0226 Building · Alteration Tenant Improvement of Existing Retail Space. Updated BOH Equipment/Work Stations for new Sit/Stand Desks. Modify the existing remote space to storage and a Manager's Office. New remote break area for Apple. Includes non-structural modifications to exterior wall finishes, New break area, single… Status: Finaled | Not published | $1.8M |