Commercial General Building, Fire Protection, Hvac/Mechanical, Plumbing, Sign work permitted October 29, 2024, with 31 permits through October 14, 2026, declaring $7,558,574 of work.
CONSTRUCT NEW ONE-STORY, 14929 SF, IIB CONSTRUCTION, COMMERCIAL SHELL BUILDING. **IF PLUMBING & MECHANICAL PLANS WERE SUBMITTED, THE BUILDING PERMIT ONLY COVERS PLAN REVIEW. SEPARATE PERMITS WILL BE REQUIRED FOR FEES & INSPECTION.** **FRC25-0087 (04.25.25): Field revision to add tenant A105**
Tacoma’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
31 permits issued Oct 29 – Oct 14, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Mar 17 | #SDEV26-0071 |
Commercial and multifamily, biggest first.
Site
ONSITE IMPROVEMENTS ASSOCIATED WITH THE INSTALLATION OF (1) SWITCHBOARD , (3) POWER CABINETS, TREX ENCLOSURE, AND (6) DISPENSERS WITH (1) UTILITY TRANSFORMER AND ASSOCIATED UTILITY EQUIPMENT TO BE INSTALLED ON SITE
Status: Permit Issued
| Not published |
| $180K |
| applied Jan 30 | #SIGN26-0007 Sign Erect (7) SIgns: (1) Pole Double- Faced Illuminated ; (1) Monument Double-Faced Illuminated ; (4) Pole Single-Faced NON-Illuminated ; (1) Monuments SIgne-Faced, Non Illuminated SIGNS Wayfinding Signs. AT TACOMA MALL ***EXISTING SIGNS: (1) Free Standing Double- FAced; (1) Free Standing,… Status: Permit Issued | Not published | $192K |
| applied Dec 29 | #SIGN25-0142 Sign Erect (6) Fascia Single -Faced illuminated Entry Wall signs to read TACOMA MALL Status: Permit Issued | Not published | $136K |
| applied Jan 14 | #SIGN26-0003 Sign INSTALL 2 CHANNEL LETTER SIGNS AND 1 BLADE SIGN CONNECT TO EXISTING SIGN CIRCUIT Status: Finaled | Not published | $9.8K |
| applied Jan 7 | #FIREC26-0006 Building · Fire Protection Installation of Captive Aire TANK system into kitchen hood at Happy Lamb Status: Finaled | Not published | $1.2K |
| applied Oct 25 | #MECHC25-0282 Building · Mechanical Installation of pre-fabricated walk in refrigeration box and equipment into the space.at Happy Lamb Hotpot Tacoma- Commercial Status: Finaled | Not published | $20K |
| applied Sep 5 | #FIREC25-0211 Building · Fire Protection Install a Fire Alarm -Detection only- (15 units) TI at Commercial - HAPPY LAMB Status: Finaled | Not published | $8K |
| applied Sep 24 | #SIGN25-0108 Sign Install (2) SF channel letter signs, on backer panels and one circle logo onto three exterior building elevations. Connect to the existing time clock and sign circuit. Status: Finaled | Not published | $7K |
| applied Aug 26 | #MECHC25-0223 Building · Mechanical HP-1 & 2 Rooftop packaged heat pump & RTU-1 rooftop package gas fire heat pump makeup air unit at COMMERCIAL Status: Finaled | Not published | $180K |
| applied Nov 26 | #BLDCA24-0456 Building · Alteration 8.32kW grid tied roof mounted solar system. Status: Finaled | Not published | $39K |
| applied Aug 25 | #PLMBC25-0225 Building · Plumbing PLUMBING SCOPE ASSOCIATED WITH A SIT-DOWN HOT POT RESTAURANT. ***FIELD REVISION 1- PLMBC25-0225Rev1.251118 Status: Finaled | Not published | $120K |
| applied Apr 24 | #BLDCA25-0128 Building · Alteration Tenant improvement of existing building and bulid-out at Happy Lamb Pot. **Separate permits required for plumbing, mechanical, and electrical scopes** ***FRC25-0250 APPROVED 10/20/25: Added a storage room, updated a room to housekeeping room, updated furniture layout and lighting layout, updated… Status: Finaled | Not published | $930K |
| applied Jun 6 | #MECHC25-0150 Building · Mechanical Relocate existing diffusers Status: Finaled | Not published | $10K |
| applied May 22 | #PLMBC25-0148 Building · Plumbing Installing roof drains, sewer stubs into tenant space, water service to each tenant space, and a floor drain. Status: Finaled | Not published | $20K |
| applied May 2 | #FIREC25-0094 Building · Fire Protection Install Captive Aire TANK Fire Suppression System into kitchen hood Status: Finaled | Not published | $1.2K |
| applied Apr 21 | #PLMBC25-0116 Building · Plumbing Plumbing for Shake Shack. Status: Finaled | Not published | $138K |
| applied Apr 1 | #MECHC25-0096 Building · Mechanical Gas piping Status: Finaled | Not published | $11K |
| applied Feb 6 | #BLDCA25-0039 Building · Alteration Buildout of A new Auntie Annes pretzels location inside existing retail space. To include: new load bearing partitions, ceiling, floor finishes and Millwork **Permit covers Plan Review only for Mechanical and Plumbing scopes. Separate permits will be required for fixtures and equipment** Status: Finaled | Not published | $190K |
| applied May 16 | #BLDCN24-0036 Building · New Building CONSTRUCT NEW ONE-STORY, 14929 SF, IIB CONSTRUCTION, COMMERCIAL SHELL BUILDING. **IF PLUMBING & MECHANICAL PLANS WERE SUBMITTED, THE BUILDING PERMIT ONLY COVERS PLAN REVIEW. SEPARATE PERMITS WILL BE REQUIRED FOR FEES & INSPECTION.** **FRC25-0087 (04.25.25): Field revision to add tenant A105** Status: Finaled | Not published | $2.9M |
| applied Nov 18 | #FIREC24-0267 Building · Fire Protection Install new fire alarm system Status: Finaled | Not published | $10K |
| applied Mar 10 | #SIGN25-0024 Sign Install of 4 wall signs Status: Finaled | Not published | $10K |
| applied Feb 11 | #BLDCA25-0041 Building · Alteration Commercial alteration including canopy over north patio at Dave's Hot Chicken. Status: Finaled | Not published | $327K |
| applied Dec 2 | #FIREC24-0284 Building · Fire Protection INSTALL A WET PIPE SPRINKLER SYSTEM TO PROTECT THE ENTIRE HEATED INTERIOR OF THE BUILDING. Status: Finaled | Not published | $28.4K |
| applied Aug 5 | #BLDCA24-0318 Building · Alteration TENANT IMPROVEMENT IN A NEW ONE-STORY COMMERCIAL BUILDING. INSTALLATION OF NEW PARTITIONS, FINISHES AND NEW KITCHEN EQUIPMENT. ****FRC25-0167 APPROVED: remove the mechanical screening.*** ** APPROVED MECHANICAL, ELECTRICAL AND PLUMBING SCOPES OF WORK WILL REQUIRE SEPARATE PERMITS FOR FIXTURES AND… Status: Finaled | Not published | $385K |
| applied Nov 18 | #FIREC24-0269 Building · Fire Protection Install new fire alarm system Status: Finaled | Not published | $10K |
| applied Oct 25 | #PLMBC24-0221 Building · Plumbing Install underground wet utility lines into tenant spaces for future TI work. Install floor drain and components in the electrical and riser room. Install vents for the grease interceptor vault system on the outside. Install roof down spout drains. Status: Finaled | Not published | $50K |
| applied Oct 25 | #SEWER24-0774 Utility Connection Open trench NEW of sanitary sewer of Commercial building. All on private property, NO work in ROW, or Patch is needed) ***FRC24-0186 APPROVED 9/17/2024 - Revision for storm system updates.*** Status: Finaled | Not published | — |
| applied Oct 25 | #SEWER24-0777 Utility Connection Open trench NEW of sanitary sewer of Commercial building. All on private property, NO work in ROW, or Patch is needed) ***FRC24-0186 APPROVED 9/17/2024 - Revision for storm system updates.*** Status: Finaled | Not published | — |
| applied Oct 25 | #SEWER24-0775 Utility Connection Open trench NEW of sanitary sewer of Commercial building. All on private property, NO work in ROW, or Patch is needed) ***FRC24-0186 APPROVED 9/17/2024 - Revision for storm system updates.*** Status: Finaled | Not published | — |
| applied Oct 25 | #SEWER24-0773 Utility Connection Open trench NEW of sanitary sewer of Commercial building. All on private property, NO work in ROW, or Patch is needed) ***FRC24-0186 APPROVED 9/17/2024 - Revision for storm system updates.*** Status: Finaled | Not published | — |
| applied May 16 | #BLDCN24-0037 Building · New Building CONSTRUCT NEW ONE-STORY, 9,670 SF, II-B CONSTRUCTION, COMMERCIAL SHELL BUILDING. **MECHANICAL AND PLUMBING REVIEW BY SEPARATE SUBMITTAL.** *** FRC25-0031 - APPROVED: Install (2) new restrooms complete with floor drains, water closet, lavatory. Install capped sanitary, vent and cold water lines for… Status: Finaled | Not published | $1.8M |