Get ProEvery project in every city · from $79/mo
Get Procommercial project · Tacoma, WA
Commercial Plumbing work permitted September 15, 2025, with 2 permits through July 8, 2026.
Offsite improvements: Installation of driveways and utility services for future EQC detached parking garage. ***FRC26-0255 APPROVED - 09/18/2026 - CIVIL - The proposed changes include removing the manhole connection to the existing storm main within Portland Ave E, shifting the proposed storm filter catch basin west within 30th Ave E and connecting it to an existing manhole, removing existing CB to CB connections and reconnecting an existing catch basin that sits at the low spot within the SW quadrant of the intersection to an existing manhole.
Tacoma’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
2 permits issued Sep 15 – Jul 8, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Aug 12 | #WO25-0098 Site Offsite improvements: Installation of driveways and utility services for future EQC detached parking garage. ***FRC26-0255 APPROVED - 09/18/2026 - CIVIL - The proposed changes include removing the manhole connection to the existing storm main within Portland Ave E, shifting the proposed storm… |
Commercial and multifamily, biggest first.
Status: Permit Issued
| Not published |
| — |
| applied Oct 1 | #WO24-0109 Site Reconstruction of an existing public sanitary sewer main that is located on property owned by the Puyallup Tribe of Indians. The sewer main currently exists within a storm and sewer easement that took the place of previously vacated alley right-of-way and a storm and sewer easement on parcel… Status: Permit Issued | Not published | — |