Get Procommercial project · Tacoma, WA
Commercial General Building, Hvac/Mechanical work permitted November 21, 2024, with 5 permits through July 2, 2026, declaring $954,210 of work.
Adding a new generator, replacing the existing automatic transfer switch (ATS), and installing a generator switchboard at Pierce County Emergency Operations and Election Center. TThe new generator will be the primary permanent backup generator, and the existing generator will be a secondary permanent backup generator.
Tacoma’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
5 permits issued Nov 21 – Jul 2, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Jun 26 | #MECHC26-0141 Building · Mechanical Installation of new duct in space and new rooftop package heat pump. Status: Finaled | Not published |
Commercial and multifamily, biggest first.
| $56.5K |
| applied Mar 24 | #BLDCA25-0085 Building · Alteration Adding a new generator, replacing the existing automatic transfer switch (ATS), and installing a generator switchboard at Pierce County Emergency Operations and Election Center. TThe new generator will be the primary permanent backup generator, and the existing generator will be a secondary… Status: Permit Issued | Not published | $580K |
| applied Jan 22 | #BLDCA26-0018 Building · Alteration REMODEL OF A PORTION OF AN EXISTING MEZZANINE THAT HAS BEEN MAINLY UTILIZED FOR STORAGE TO ACCOMMODATE ADDITIONAL OFFICE SPACE, APPROXIMATELY 1,000 SF. THE SCOPE ALSO INCLUDES REVISIONS TO THE EXISTING HVAC SYSTEM INCLUDING THE ADDITION OF A NEW MECHANICAL ROOFTOP UNIT, AND REVISIONS TO EXISTING… Status: Finaled | Not published | $100K |
| applied Mar 24 | #MECHC25-0088 Building · Mechanical Install of a new generator, replacing the existing automatic transfer switch (ATS), and installing a generator switchboard. ** at Commercial Status: Permit Issued | Not published | $580K |
| applied Jan 9 | #WO24-0015 Site FOR ASTOUND BROADBAND "ASTOUND - 49747 - 2501 S 35TH ST - UG", FROM PROPSOED RISER ON EXISTING TPU UTILITY POLE ON SOUTH SIDE OF S TACOMA WAY, INSTALL (1) 2" CONDUIT WEST, SOUTH ON SPRAGUE AVE AND WEST ON S 35TH ST USING OPEN TRENCH AND HOLE HOG METHODS. PLACE VAULTS AS PER PLANS. PULL CABLE… Status: Closed | Not published | $218K |