Get Procommercial project · Tacoma, WA
Commercial General Building, Elevator, Fire Protection, Plumbing work permitted January 8, 2025, with 7 permits through December 31, 2025, declaring $16,887,196 of work.
Shoreline related improvements: the existing shoreline bulkhead and two dock structures will be removed, and the shoreline will be restored and enhanced by improving shoreline slopes (re-grading and armoring) and planting an assortment of native vegetation. A new pile-supported replacement ramp and dock float structure is proposed along the Thea Foss Waterway. A new consolidated outfall is also proposed. Related to SDEV24-0329. ***FRC25-0268 APPROVED 11/18/25 FRC Covers all dry fire and vessel water supply utilities to the floating dock. Scope includes upland and over-water routing and…
Tacoma’s permit records for this address don’t name a contractor; the permits list the scope, value and dates below.
7 permits issued Jan 8 – Dec 31, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Oct 2 | #BLDCN25-0048 |
Commercial and multifamily, biggest first.
Building · New Building
Installation of new floating dock with steel guide piles on the Thea Foss waterway, a new 100ft aluminum gangway, and a new pile supported gangway abutment.
Status: Permit Issued
| Not published |
| $677K |
| applied Aug 19 | #BLDCA25-0266 Building · Alteration Erect a retaining wall between sidewalk improvements that are part of WO24-0122. Frontage improvements for the Tacoma Maritime Center are permitted under WO24-0122. Status: Permit Issued | Not published | $10K |
| applied Nov 3 | #WO24-0122 Site Frontage improvements for the Tacoma Maritime Center ***FRC25-0225 APPROVED: Signage updates, sidewalk grade changes, and a notation change to the "keystone wall", now referred to as a "retaining wall." Signage updates came under the direction of the City of Tacoma and include the removal of an… Status: Permit Issued | Not published | — |
| applied Nov 20 | #SDEV24-0414 Site This SDEV is associated with SDEV24-0329 and has been submitted to include RAIL ONLY work. For consistency, rail plans match the plans submitted to BNSF for 60% design review. All work proposed in this SDEV will be reviewed and permitted by BNSF. Rail improvements will include the removal of… Status: Finaled | Not published | $5.7M |
| applied Nov 20 | #SDEV24-0416 Site Shoreline related improvements: the existing shoreline bulkhead and two dock structures will be removed, and the shoreline will be restored and enhanced by improving shoreline slopes (re-grading and armoring) and planting an assortment of native vegetation. A new pile-supported replacement ramp… Status: Permit Issued | Not published | $9M |
| applied May 15 | #SEWER25-0343 Utility Connection New sanitary sewer line connection - main connection at SSMH#1 as part of the Port of Tacoma Maritime project Status: Finaled | Not published | — |
| applied Aug 23 | #SDEV24-0330 Site SDEV 2A to accompany the full project SDEV 2B (SDEV24-0329) submittal and includes Geotechnical Ground Improvements for the related buildings. Status: Finaled | Not published | $1.5M |