Get ProEvery project in every city · from $79/mo
Get Procommercial project · Seattle, WA
Commercial General Building, Electrical, Roofing, Sign work permitted November 15, 2024, with 17 permits through September 30, 2026, declaring $2,594,790 of work. Contractor on record: Applied Technical Systems, Inc..
Overlay the existing roofing with new rigid insulation and 60mil white TPO.
Seattle permit records name Applied Technical Systems, Inc., Sea-Tac Electric Inc and Summit Solutions Group, LLC as the contractors on this project, among 10 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
17 permits issued Nov 15 – Sep 30, newest first.
| Issued | Permit | Contractor | Value |
|---|
Commercial and multifamily, biggest first.
#7165198-EL Electrical · Electrical NEW SECURITY POLE LIGHT Status: Issued | Not published | — | |
#7163191-EL Electrical · Electrical POWER IN FOOD AND BAKERY DEPTS Status: Issued | Not published | — | |
#7121365-EL Electrical · Electrical Pull cable to five cameras that need to be moved above the aisles. Pull one cable for a new camera. Status: Completed | Applied Technical Systems, Inc. | $3K | |
| applied Sep 15 | #7102768-CN Addition/Alteration · Building Construct tenant improvements to north portion for existing retail (Fred Meyer) per plan. Status: Completed | Not published | $300K |
#7105979-EL Electrical · Electrical relocating (8) 20 amp circuits Status: Completed | Sea-Tac Electric Inc | $15K | |
| applied Jun 6 | #7089439-EL Electrical · Electrical REMOVE (3) SIGNET POWER UNITS INSTALL (2) BTC GEN IV POWER UNITS REMOVE (3) SIGNET GEN III EXISTING DISPENSERS INSTALL (3) BTC GEN IV DISPENSERS [6/23/25 KEF - Plan set approved.] Status: Completed | Summit Solutions Group, LLC | $32.4K |
#7091092-EL Electrical · Electrical WIRE TO CONNECT TO (4) NEW HVAC UNITS, WALK-WAY LIGHTING, AND ALSO DISCONNECT/ RECONNECT ROOF EQUIPMENT FOR NEW ROOFING Status: Completed | Not published | $7.5K | |
#7091027-EL Electrical · Electrical Cellular DAS project in Seattle Storage Tunnel Status: Completed | Day Wireless Communications | $30K | |
#7080589-RR Roof · Roof Overlay the existing roofing with new rigid insulation and 60mil white TPO. Status: Completed | John Schirm | $2.1M | |
#7077931-EL Electrical · Electrical Installing (1) cat 6 cable to (1) Traffic Camera Status: Completed | Cochran Incorporated | $1.5K | |
#7077885-EL Electrical · Electrical Rogers will run customer provided Speaker Wire from the back of house amp to the two speakers on the sales floor, daisy chain if possible. Status: Completed | Lin R. Rogers Electrical Contractors, Inc | $800 | |
| applied Feb 14 | #7070716-CN Addition/Alteration · Building Construct non-structural alterations to existing commercial building Subject to Field Inspection (STFI) Status: Completed | Not published | $75K |
#7075205-EL Electrical · Electrical Install owner provided light fixtures. EC to furnish all required lighting controls including:contactors, timeclocks, 2-hour overrides, current limiters, etc. Status: Completed | Southgate Electric Inc | $16K | |
#7070786-EL Electrical · Electrical REPLACE EXTERIOR LIGHT FIXTURES Status: Completed | Not published | $2.5K | |
| applied Feb 13 | #7069468-SB Sign, Awning and Canopy · Trade One new wall sign & new tenant sign in existing pole sign. Status: Completed | Meyer Sign Company | $5.6K |
#7064832-EL Electrical · Electrical 436527 BECU - TRACE OUT COMM'S CONDUIT FOR RE-ROUTING Status: Completed | OEG, Inc | $3.5K | |
#7056614-EL Electrical · Electrical POWER FOR SECURITY GATE AT ENTRANCE Status: Completed | Not published | $2K |
In Seattle, biggest first.