Get Procommercial project · Seattle, WA
Commercial General Building, Electrical work permitted June 10, 2025, with 5 permits through August 6, 2026, declaring $1,810,000 of work. Contractor on record: Redline Electric LLC.
Replace: (2) 750 kW generators, above ground fuel tank, and automatic transfer switches with new: (3) 500 kW generators, with belly tanks, generator switchboard, Essential distribution Swbd, ATS, MTS. Optional Power system, NEC 702 system Generators are used for critical communications including 911 and are exempt from noise level requirements. High quality, level 2 acoustical enclosures are provided. [7-16-26 D Rankin - Feeder for panel DP being changed to (3)4" with 600kcmil CU in lieu of (
Seattle permit records name Redline Electric LLC and Frahler McCoy Electric as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
5 permits issued Jun 10 – Aug 6, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
Commercial and multifamily, biggest first.
#7156899-EL Electrical · Electrical INSTALLATION OF 48KW STANDBY DIESEL GENERATOR WITH 200A 120/240V 1PH FEEDER AND BATTERY CHARGER & BLOCK HEATER CIRCUITS CONNECTED TO EXSITING 200AMP ILC/ATS PANEL. Status: Completed |
| Redline Electric LLC |
| — |
| applied Oct 17 | #7046648-CN Addition/Alteration · Building Construct minor alterations to telecommunication facility (AT&T) at existing tower per plan Status: Completed | Not published | $30K |
| applied Feb 26 | #7060515-CN Addition/Alteration · Building Construct alterations to utility structures per plan. Status: Issued | Not published | $10K |
| applied Dec 19 | #7061978-EL Electrical · Electrical Replace: (2) 750 kW generators, above ground fuel tank, and automatic transfer switches with new: (3) 500 kW generators, with belly tanks, generator switchboard, Essential distribution Swbd, ATS, MTS. Optional Power system, NEC 702 system Generators are used for critical communications including… Status: Issued | Frahler McCoy Electric | $1.8M |
| applied Mar 20 | #7074205-CN Addition/Alteration · Building Construction additions and alterations to site for telecom (T-Mobile) on site of existing telecom site per plan Status: Inspections Completed | Not published | $20K |
In Seattle, biggest first.