Multifamily General Building, Demolition, Electrical, Elevator, Fire Protection, Hvac/Mechanical work permitted June 16, 2025, with 14 permits through April 2, 2026, declaring $13,526,438 of work. Contractor on record: Bold Low Voltage.
Establish use as multi-family residence per land use code. Construct apartment building occupy per plan. Mechanical included
Seattle permit records name Bold Low Voltage, Exact Electric, LLC and Atlas Mechanical Inc as the contractors on this project, among 5 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
14 permits issued Jun 16 – Apr 2, newest first.
Commercial and multifamily, biggest first.
| Issued | Permit | Contractor | Value |
|---|
| applied Mar 31 | #7135997-FS Fire Sprinkler and Suppression · Trade Revision to existing approved permit number 7132886-FS. Adding underground fire service line to project scope. Status: Issued | Not published | $242K |
#7135898-EL Electrical · Electrical Installation of access control system with 19 access control points and 1 telephone entry panel. Installation of Cat6 infrastructure Status: Issued | Bold Low Voltage | — | |
| applied Mar 13 | #7132886-FS Fire Sprinkler and Suppression · Trade Revision to approved permit 7109622-FS; adding sprinkler protection to residential decks Status: Issued | Not published | $242K |
| applied Mar 12 | #7133240-RF Refrigeration · Trade (78) Split Sytems & (2) RTU Units Status: Issued | Atlas Mechanical Inc | $950K |
#7133241-EL Electrical · Electrical We are doing thermostats for (78) Split systems and (2) RTU's Status: Issued | Atlas Mechanical Inc | — | |
| applied Jan 28 | #7126927-EL Electrical · Electrical This is a revision to issued Permit 7103252-EL, issued 10/15/2025. This submittal reflects the removal of an Elevator Pressurization System, as the owner will now be installing smoke resistant elevator curtains. Status: Issued | Bold Low Voltage | $116K |
| applied Feb 24 | #7130695-CY Conveyance · Trade Installation of Gen3 Core Traction Elevator - N1KF32 6859511-CN (Construction Permit) 2018 SBC = 2020 SEC = 2019 A17.1 = 2017 A18.1 Status: Issued | Otis Elevator Company | $167K |
| applied Aug 26 | #7103252-EL Electrical · Electrical Installation of a new fire alarm & signaling system in the building including integration with the elevator pressurization system & sprinkler system; [10/20/26 RN Renewal/Reinstatement fee added] Status: Issued | Bold Low Voltage | $116K |
| applied Aug 14 | #7101694-EL Electrical · Electrical 96 Unit apartment complex, slab on grade 9/16/2026 AB: Renewal Status: Issued | Exact Electric, LLC | $1.1M |
| applied Oct 1 | #7109622-FS Fire Sprinkler and Suppression · Trade INSTALLATION OF A NEW WET SPRINKLER SYSTEM, ALONG WITH 2 CLASS 1 STANDPIPES, DESIGNED AND INSTALLED IN ACCORDANCE WITH 2019 NFPA 13, 14, 2021 IFC & IBC, AS WELL AS LOCAL JURISDICTION SPECIFICATION/GUIDELINES. Status: Issued | Not published | $242K |
#7108097-EL Electrical · Electrical Ufer Inspection Status: Completed | Exact Electric, LLC | $1K | |
| applied Jul 31 | #7099346-EL Electrical · Electrical 1- 400amp 277v-480v 3 phase overhead service temporary power with 1-75kva step down transformer and 120v-208v 3 phase 200amp panel [8/5/2025 BGO - Approved Temp Service Plan Set] Status: Completed | Exact Electric, LLC | $10K |
| applied Aug 8 | #6859511-CN New · Building Establish use as multi-family residence per land use code. Construct apartment building occupy per plan. Mechanical included Status: Issued | Resolve General Construction | $8.9M |
| applied Dec 1 | #6859512-DM Demolition · Demolition Demolition of north building per plan. Status: Issued | Not published | $2M |