Get Procommercial project · Seattle, WA
Commercial General Building, Electrical, Elevator work permitted May 7, 2025, with 8 permits through September 30, 2026, declaring $345,160 of work. Contractor on record: Art Electrical LLC.
New installation of traction elevator 6748293-CN (Construction Permit) 2018 SBC = 2020 SEC = 2019 A17.1 = 2017 A18.1
Seattle permit records name Art Electrical LLC, Forecast Roofing & Solar LLC and Fire Systems West, Inc. as the contractors on this project, among 5 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
8 permits issued May 7 – Sep 30, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
Commercial and multifamily, biggest first.
#7154470-CN Addition/Alteration · Building Install solar PV system on apartment building roof per plan. Status: Issued |
| Not published |
| $4.6K |
#7152245-EL Electrical · Electrical Install 8.8 kW DC roof top, grid tied solar pv system Status: Completed | Forecast Roofing & Solar LLC | — |
#7148870-EL Electrical · Electrical Low voltage security camera system Status: Completed | Art Electrical LLC | — |
#7139141-EL Electrical · Electrical Low voltage access control system Status: Completed | Art Electrical LLC | — |
| applied Jun 10 | #7090293-EL Electrical · Electrical Install new fire alarm system in R-2 occupancy, eight-story building. Install smoke detectors throughout the corridors. Install notification throughout the corridors and units. Monitor sprinkler riser. Install devices for elevator recall. Monitor stairwell pressurization fans. Status: Completed | Fire Systems West, Inc. | $52.8K |
#7088385-EL Electrical · Electrical ufer test Status: Completed | Art Electrical LLC | — |
#7086926-EL Electrical · Electrical Install (8) thermostats in support of 7029005-ME; [4/20/26 RN Renewal/Reinstatement fee added] Status: Completed | Air Systems Engineering | $5.3K |
| applied May 7 | #7084515-CY Conveyance · Trade New installation of traction elevator 6748293-CN (Construction Permit) 2018 SBC = 2020 SEC = 2019 A17.1 = 2017 A18.1 Status: Completed | TK Elevator | $282K |