Get ProEvery project in every city · from $79/mo
Get Promultifamily project · Seattle, WA
Multifamily Electrical, Sign work permitted November 19, 2024, with 5 permits through June 5, 2026, declaring $38,151 of work. Contractor on record: The Safety Team, Inc..
Disconnect, re-connect 1 RTU. Remove 6 lights, 3 GFI's, convert 10 fluorescent cans to LED add 51 CFM fans to laundry rooms of each condo. Re-install the 6 lights and 3 GFI's after facade improvements are done
Seattle permit records name The Safety Team, Inc., Green City Electrical and Northwest Sign and Design as the contractors on this project, among 4 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
5 permits issued Nov 19 – Jun 5, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
Commercial and multifamily, biggest first.
#7146596-EL Electrical · Electrical Move existing light fixtures and add two receptacles one circuit for everything Status: Completed |
| Green City Electrical |
| — |
#7133759-EL Electrical · Electrical Relocate one (1) existing smoke detector Status: Completed | The Safety Team, Inc. | — |
| applied Feb 9 | #7127426-SB Sign, Awning and Canopy · Trade Installation of (1) non illuminated extexrior sign that combine reads the name and address of the condominiums "3213 The Verge". The sign will be made from a 1/8" ACM panel that is painted first surface. Status: Completed | Northwest Sign and Design | $2.7K |
#7084034-EL Electrical · Electrical Install an AES radio frequency monitoring transmission panel for an existing fire alarm system Status: Completed | The Safety Team, Inc. | $1K |
#7057192-EL Electrical · Electrical Disconnect, re-connect 1 RTU. Remove 6 lights, 3 GFI's, convert 10 fluorescent cans to LED add 51 CFM fans to laundry rooms of each condo. Re-install the 6 lights and 3 GFI's after facade improvements are done Status: Completed | Clover Creek Electric Inc | $34.5K |
In Seattle, biggest first.