Get ProEvery project in every city · from $79/mo
Get Procommercial project · Seattle, WA
Commercial General Building, Electrical, Elevator, Sign work permitted May 8, 2026, with 15 permits through October 7, 2026, declaring $53,410 of work. Contractor on record: Kings III of America, LLC.
Construct tenant improvements to existing commercial building at ground floor SW suite (Paris Baguette bakery) (interior Soft Demo only) Subject to field inspection.
Seattle permit records name Kings III of America, LLC, Mid-American Elevator and Kot Electric LLC as the contractors on this project, among 4 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
The contractor on 1 permit issued in the last 30 days is included with Pro.
See the contractorCommercial and multifamily, biggest first.
15 permits issued May 8 – Oct 7, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Sep 16 | #7162949-EL Electrical · Electrical Modify existing fire alarm system for new tenant space. Installing (15) new notification devices, (6) new duct smoke detectors with shutdown and remote test switches, and relocating existing hood suppression input module. Status: Issued | Contractor with Pro | $10K |
#7164099-EL Electrical · Electrical Provide power & lighting to TI remodel Status: Issued | Kot Electric LLC | — | |
| applied Sep 2 | #7160329-SB Sign, Awning and Canopy · Trade Install (2) channel letter sets to read PARIS BAGUETTE on South-side of bld. and (2) round hanging logo signs, and (1) round logo sign on West-side. 9/2/26 SS: Fees added for 5 sign circuits to include electrical on this permit. Fees added for 1 interior sign (F) omitted from application but… Status: Issued | New Image Creative Sign Inc. | $13.8K |
| applied Aug 28 | #7160140-CY Conveyance · Trade Cellular device will be installed in the telecommunications room and new phone will be installed in the elevator COP. EQP-SI-06926 / EQP-CY-05609 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) conveyance number-7537 Status: Issued | Kings III of America, LLC | $1K |
| applied Aug 28 | #7160141-CY Conveyance · Trade Cellular device will be installed in the telecommunications room and new phone will be installed in the elevator COP. EQP-SI-06926 / EQP-CY-05606 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) conveyance number- 7409 Status: Issued | Kings III of America, LLC | $1K |
| applied Aug 28 | #7160138-CY Conveyance · Trade Cellular device will be installed in the telecommunications room and new phone will be installed in the elevator COP. EQP-SI-06926 / EQP-CY-05611 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) conveyance number-7539 Status: Issued | Kings III of America, LLC | $1K |
| applied Aug 28 | #7160143-CY Conveyance · Trade Cellular device will be installed in the telecommunications room and new phone will be installed in the elevator COP. EQP-SI-06926 / EQP-CY-05608 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) conveyance number- 7410 Status: Issued | Kings III of America, LLC | $1K |
| applied Aug 28 | #7160063-CY Conveyance · Trade Cellular device will be installed in the telecommunications room and new phone will be installed in the elevator COP. EQP-SI-06926 / EQP-CY-05612 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Status: Issued | Kings III of America, LLC | $1K |
| applied Aug 28 | #7160142-CY Conveyance · Trade Cellular device will be installed in the telecommunications room and new phone will be installed in the elevator COP. EQP-SI-06926 / EQP-CY-05610 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) conveyance number- 7538 Status: Issued | Kings III of America, LLC | $1K |
| applied Aug 10 | #7157371-CN Addition/Alteration · Building Construct tenant improvements to existing commercial building at ground floor SW suite (Paris Baguette bakery) (interior Soft Demo only) Subject to field inspection. Status: Issued | Not published | $27K |
| applied May 13 | #7142911-CY Conveyance · Trade Customer is installing an Axis P9117-PV Corner Camera - Elev. 3 EQP-SI-06926 / EQP-CY-05606 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Revised Permit from car 7 to car 3 Status: Issued | Mid-American Elevator | $1.6K |
| applied May 8 | #7142183-CY Conveyance · Trade Customer is installing an Axis P9117-PV Corner Camera - Car 4 EQP-SI-06926 / EQP-CY-05609 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Status: Issued | Mid-American Elevator | $1.6K |
| applied May 8 | #7142185-CY Conveyance · Trade Customer is installing an Axis P9117-PV Corner Camera - Car 5 EQP-SI-06926 / EQP-CY-05610 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Status: Issued | Mid-American Elevator | $1.6K |
| applied May 8 | #7142187-CY Conveyance · Trade Customer is installing an Axis P9117-PV Corner Camera - Car 6 EQP-SI-06926 / EQP-CY-05611 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Status: Issued | Mid-American Elevator | $1.6K |
| applied May 8 | #7142189-CY Conveyance · Trade Customer is installing an Axis P9117-PV Corner Camera - Car 7 EQP-SI-06926 / EQP-CY-05612 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Status: Issued | Mid-American Elevator | $1.6K |
In Seattle, biggest first.