Commercial General Building, Electrical, Fire Protection, Hvac/Mechanical work permitted January 9, 2026, with 7 permits through May 15, 2026, declaring $267,780 of work. Contractor on record: Johnson Electric, Inc.
Construct interior non-structural alterations to existing second floor office tenant space (First Fed) per plot plan and subject to field inspection (STFI).
Seattle permit records name Johnson Electric, Inc, Synergy Electrical Contracting and Columbia Fire as the contractors on this project, among 4 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
7 permits issued Jan 9 – May 15, newest first.
| Issued | Permit | Contractor |
|---|
Commercial and multifamily, biggest first.
| Value |
|---|
#7143510-EL Electrical · Electrical Adding 11 Data Drops. Status: Issued | Synergy Electrical Contracting | — | |
| applied Apr 7 | #7136682-ME Mechanical · Trade Demo existing ductwork. add (8) new floor GRDs and rebalance zones with new GRDs - Subject to Field Inspection (STFI) Status: Issued | Not published | $13.5K |
#7137144-FS Fire Sprinkler and Suppression · Trade Modify the existing fire sprinkler system to accommodate the new walls and ceilings. Status: Completed | Columbia Fire | $4.3K | |
#7136669-EL Electrical · Electrical Modification to existing fire alarm system. Remove existing devices and reinstall (1) device as show on drawings. Status: Completed | Johnson Controls Fire Protection | — | |
#7134460-EL Electrical · Electrical Tenant reconfiguration Status: Completed | Johnson Electric, Inc | — | |
| applied Aug 22 | #7103066-CN Addition/Alteration · Building Construct interior non-structural alterations to existing second floor office tenant space (First Fed) per plot plan and subject to field inspection (STFI). Status: Completed | Not published | $250K |
#7124265-EL Electrical · Electrical Status: Completed | Johnson Electric, Inc | — |