Get ProEvery project in every city · from $79/mo
Get Procommercial project · Seattle, WA
Commercial General Building, Electrical, Elevator work permitted March 25, 2025, with 9 permits through May 19, 2026, declaring $69,395 of work. Contractor on record: West Coast Elevator LLC.
Relocate panel and rewire fully remodeled unit.
Seattle permit records name West Coast Elevator LLC, Acorn Stairlifts Inc and Viking Electric as the contractors on this project, among 5 contractors in all.
Phone numbers and the property owner are included with Pro, where the city publishes them.
9 permits issued Mar 25 – May 19, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
Commercial and multifamily, biggest first.
#7143911-EL Electrical · Electrical Kitchen Clean/Up & Rewire where Necessary Status: Completed |
| Not published |
| — |
| applied Apr 10 | #7137775-CY Conveyance · Trade New Stairlift installation in the home of Stephen Chentow. 2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1 Status: Completed | Acorn Stairlifts Inc | $14.2K |
#7135948-EL Electrical · Electrical provide raceway and branch circuit for electric gate. Status: Completed | Viking Electric | — |
| applied Nov 22 | #7118047-CN Addition/Alteration · Building Construct interior non-structural alterations within Unit 317 of multi-family building [LAKESIDE WEST CONDOMINIUM] subject to field inspection [STFI]. Status: Issued | Not published | $10K |
#7115020-EL Electrical · Electrical Relocate panel and rewire fully remodeled unit. Status: Issued | Bradley Electric LLC | $22.5K |
| applied Apr 29 | #7082854-CY Conveyance · Trade Add elevator to their back-up emergency power generator. EQP-SI-05195 / EQP-CY-02444 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Completed | West Coast Elevator LLC | $17.9K |
| applied Apr 29 | #7082862-CY Conveyance · Trade Add elevator to their emergency back-up generator. EQP-SI-05195 / EQP-CY-02445 (2021 SBC = 2019 A17.1 = 2023 NEC/SEC = 2020 A18.1) Status: Completed | West Coast Elevator LLC | $17.9K |
#7080240-EL Electrical · Electrical Perform a 1, 2 or 4 hour load bank test on standby Generator, disconnect building conductors, connect load bank, perform load bank test, land and torque building conductors. Status: Completed | Not published | $800 |
#7077225-EL Electrical · Electrical In unit 206 and 207, install dedicated circuit for washer and for dryer. Status: Completed | The Electric Company of Seattle | $4K |