Get ProEvery project in every city · from $33/mo
Get Procommercial project · Seattle, WANew: first permit Oct 20
Commercial Elevator work permitted October 20, 2026, with 2 permits through October 20, 2026, declaring $68,500 of work.
Install Symmetry vertical platform lift to replace old lift EQP-SI-06301 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1)
This is a new project: its first permit was issued October 20, 2026. The contractor on it is included with Pro, with the phone number, and is named here 30 days after the first permit.
See the contractor2 permits issued Oct 20 – Oct 20, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
| applied Oct 20 | #7166965-CY Conveyance · Trade Install Symmetry vertical platform lift to replace old lift EQP-SI-06301 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) |
Status: Issued
| Contractor with Pro |
| $65K |
| applied Oct 20 | #7168319-CY Conveyance · Trade Remove existing vertical platform lift EQP-SI-06301 / EQP-CY-04518 (2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1) Status: Issued | Contractor with Pro | $3.5K |