Get ProEvery project in every city · from $79/mo
Get Procommercial project · Seattle, WA
Commercial Electrical, Elevator, Hvac/Mechanical work permitted January 8, 2025, with 5 permits through October 1, 2026, declaring $179,055 of work. Contractor on record: Power Fix LLC.
Installation of (1) Wildeck Material Lift 2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1
Seattle permit records name Power Fix LLC and Miner ltd dba Pace Material Handling as the contractors on this project.
Phone numbers and the property owner are included with Pro, where the city publishes them.
5 permits issued Jan 8 – Oct 1, newest first.
| Issued | Permit | Contractor | Value |
|---|---|---|---|
#7165504-EL Electrical · Electrical |
Commercial and multifamily, biggest first.
Installing wiring for new equipment lift including supply disconnect, main controller, limit switches, hoist motor, and control stations.
Status: Completed
| Power Fix LLC |
| — |
| applied Aug 18 | #7156044-CY Conveyance · Trade Installation of (1) Wildeck Material Lift 2021 SBC = 2023 NEC/SEC = 2019 A17.1 = 2020 A18.1 Status: Issued | Miner ltd dba Pace Material Handling | $121K |
#7072122-EL Electrical · Electrical Install wiring for new walk in cooler and freezer. Status: Completed | Power Fix LLC | $18K |
| applied Feb 18 | #7070724-RF Refrigeration · Trade Installation of walk in cooler and freezer box with rooftop condensing units and matching evaporator coils. Status: Completed | Not published | $40K |
| applied Sep 7 | #7037873-ME Mechanical · Trade Installation of large walk in cooler and walk in freezer box with condensing unit and matching evaporator coil, per plan. Status: Completed | Not published | $40K |
In Seattle, biggest first.